Trane 4YCY4024 Скачать руководство пользователя страница 18

Page 18 

                 

Installer’s Guide

.

c

e

S

w

o

l

F

.

c

e

S

w

o

l

F

.

c

e

S

w

o

l

F

.

c

e

S

w

o

l

F

8

0

0

9

9

2

8

4

2

0

5

4

4

1

2

8

8

8

9

0

0

8

0

3

0

4

2

1

5

1

4

1

4

8

6

8

0

1

0

2

7

1

3

2

3

2

2

5

8

3

1

6

8

4

8

1

1

5

5

6

2

3

5

2

2

3

5

6

3

1

8

8

2

8

2

1

0

0

6

3

3

8

1

2

4

5

3

3

1

0

9

0

8

3

1

5

5

5

4

3

2

1

2

5

5

1

3

1

2

9

8

7

4

1

4

1

5

5

3

6

0

2

6

5

9

2

1

4

9

6

7

5

1

0

8

4

6

3

0

0

2

7

5

6

2

1

6

9

5

7

6

1

0

5

4

7

3

5

9

1

8

5

4

2

1

8

9

3

7

7

1

4

2

4

8

3

9

8

1

9

5

2

2

1

0

0

1

2

7

8

1

0

0

4

9

3

5

8

1

0

6

0

2

1

4

0

1

9

6

9

1

9

7

3

0

4

0

8

1

2

6

6

1

1

8

0

1

7

6

0

2

0

6

3

1

4

6

7

1

4

6

2

1

1

2

1

1

4

6

1

2

3

4

3

2

4

2

7

1

6

6

9

0

1

6

1

1

2

6

2

2

7

2

3

3

4

7

6

1

8

6

6

0

1

0

2

1

0

6

3

2

3

1

3

4

4

4

6

1

0

7

3

0

1

4

2

1

8

5

4

2

0

0

3

5

4

0

6

1

2

7

0

0

1

8

2

1

6

5

5

2

8

8

2

6

4

7

5

1

4

7

7

9

2

3

1

4

5

6

2

7

7

2

7

4

3

5

1

6

7

5

9

6

3

1

3

5

7

2

7

6

2

8

4

0

5

1

8

7

2

9

0

4

1

1

5

8

2

7

5

2

9

4

7

4

1

0

8

0

9

4

4

1

0

5

Figure 18. Burner and Valve

NOTE

:  For manifold pressures and orifice sizes for gas with 

other BTU ratings, contact the local gas utility. Manifold  

 

pressure should be 1.8  (low) to 3.5 (high) inches water column  

(+0.1).  Input for natural gas must 

not

 exceed the value shown 

on the unit nameplate.

  1. Install a tapped, Style A (1/8-inch NPT tap) shut-off gas cock at 

the end of the gas supply line near the unit.  Be sure the tapped 

gas cock is downstream of the pressure regulator, if used.

  2. Install a ground union joint downstream of the shut-off cock.  

This joint must also be installed outside of the unit.

  3. Install a drip leg at least six (6) inches in depth next to the union 

as shown in Figure 17.  This drip leg is required to collect any 

sediment that may be deposited in the line.

  4. Before connecting the piping circuit to the unit, bleed the air 

from the supply line and then cap or plug the line and test the 

pressure at the tapped shut-off cock.  The pressure reading 

should not exceed 14 inches water column.

  5. Using an appropriate backup wrench on the gas valve inlet boss, 

connect the gas piping to the unit.  Check the completed piping 

for leaks using a soap and water solution or the equivalent.

  6. After installation of the gas pipe in the unit, the pipe opening 

should be closed with the filler/barrier plug provided.

Manifold Pressure

Check the manifold pressure at the unit gas valve.  Do not exceed 

the recommended pressure shown on the unit nameplate.

Input Check and Adjustment

  1. Make sure all gas appliances are off except the furnace.

  2. Clock the gas meter with the furnace operating (determine the 

dial rating of the meter) for one revolution.

  3. Match the “Sec” column in the gas flow (in cfh) Table 3, on page 

18, with the time clocked.

  4. Read the “Flow” column opposite the number of seconds clocked.

  5. Use the following factors if necessary.

  6. Multiply the final figure by the heating value of the gas obtained 

from the utility company and compare to the nameplate rating.  

This must not exceed the nameplate rating.

  7. Changes can be made by adjusting the manifold pressure.

 

a. Attach a manifold pressure gauge.

 

b. Remove the slot screw on top of the gas valve for 1st stage 

manifold pressure adjustment.  Remove slot screw on outlet 

side for 2nd stage adjustment (See Figure 18).

 

 

c. Turn the adjustment nut in to increase the gas flow rate, and 

out to decrease the gas flow rate using a 3/32" hex wrench.

Chart Flow Reading

2

Chart Flow Reading

4

10X Chart Flow Reading

4

For 1 Cu. Ft. Dial Gas Flow CFH = 

For 1/2 Cu Ft. Dial Gas Flow CFH = 

For 5 Cu. Ft. Dial Gas Flow CFH = 

Outlet Pressure Boss

2nd Stage (HI) 

Manifold Pressure 

Adjustment

Regulator 

Vent

Inlet Pres-

sure Boss

Gas Valve 

ON/OFF 

Toggle 

Switch

High Fire Coil 

Terminal (H)

1st Stage 

(LO) 

Manifold 

Pressure 

Adjustment

Common 

Terminal (C)

Coaxial Coil 

Terminal (M)

Table 3. Gas Flow in Cubic Feet Per Hour 

2 Cubic Foot Dial

Содержание 4YCY4024

Страница 1: ...inherent hazards during installation and service the electrical supply must be disconnected and the main gas valve must be turned off If operating checks must be performed with the unit operating it i...

Страница 2: ...ENING SYSTEM Failure to follow proper procedures can result in personal illness or injury or severe equipment damage RECONNECT ALL GROUNDING DEVICES All parts of this product that are capable of condu...

Страница 3: ...erwriters Laboratory An LP Gas conver sion kit is available Extreme mounting kits for slab and curbs are also available Packaged units are designed for outdoor mounting with a vertical condenser disch...

Страница 4: ...ep 2 Determine Unit Clearances Figure 1 4YCY4024 through 4YCY4036 1 of 3 Figures 1 through 6 show the unit critical dimensions NOTE The view labeled Bottom Side represents the Base as viewed looking u...

Страница 5: ...Page 5 Installer s Guide Figure 2 4YCY4024 through 4YCY4036 2 of 3...

Страница 6: ...Page 6 Installer s Guide Figure 3 4YCY4024 through 4YCY4036 3 of 3...

Страница 7: ...Page 7 Installer s Guide Figure 4 4YCY4042 through 4YCY4060 1 of 3 NOTE The view labeled Bottom Side represents the Base as viewed looking up from underneath the unit...

Страница 8: ...Page 8 Installer s Guide Figure 5 4YCY4042 through 4YCY4060 2 of 3...

Страница 9: ...Page 9 Installer s Guide Figure 6 4YCY4042 through 4YCY4060 3 of 3...

Страница 10: ...Refer to the Installation section for instruction on converting the supply and return airflow covers to down airflow 3 The field assembled Roof Mounting Curb BAYCURB050A or BAYCURB051A or a field fabr...

Страница 11: ...ce to combustible mate rial shall be maintained on air outlet duct 4 Attach the supply and return air ducts to the unit as explained Rooftop Installation Curb Mounting Convert Horizontal Airflow to Do...

Страница 12: ...he unit casing casing hardware corner lugs angles tabs or flanges Failure to observe these warnings may result in equipment damage 1 Before preparing the unit for lifting check the unit dimension draw...

Страница 13: ...For roof top applications using field fabricated ducts and sleeper rails rather than a curb or frame use the following procedure 1 Locateandsecurethesleeperrailstotheroof Three 3 sleeper rails are re...

Страница 14: ...drawing The manufacturer is not responsible for the unauthorized use of this drawing and expressly disclaims any liability for damages resulting from such unauthorized use Gasket Seal Spreader Bars B...

Страница 15: ...rizontal Airflow Application with Frame Supply Air Return Air Roof Flashing Channel Iron Center Support Center Sup port required on all Frame Applications Angle Iron Frame Roof Flashing Return Air Ang...

Страница 16: ...wo 2 feet from the unit to minimize noise and resistance To prevent leaking do not attach the ductwork to the bottom of the unit base refer to the bottom example in Figure 14 Condensate Drain Piping A...

Страница 17: ...SURE DROP OF 0 3 INCH W C AND 0 6 SP GR GAS IMPORTANT Before making the gas pipe connection give serious consideration to providing the clearance necessary to remove the accesspanelsontheunit e g econ...

Страница 18: ...cap or plug the line and test the pressure at the tapped shut off cock The pressure reading should not exceed 14 inches water column 5 Usinganappropriatebackupwrenchonthegasvalveinletboss connect the...

Страница 19: ...in the absence of local codes with the National Electrical Code ANSI NFPA 70 Latest Revision NOTE This unit is factory wired for 230V See wiring dia gram for 208V conversion NOTE For branch circuit w...

Страница 20: ...Switch Provide an approved weatherproof disconnect within close proxim ity to and within sight of the unit If disconnect must be mounted to the cabinet the location shown in Figure 21 should be the o...

Страница 21: ...757192i2 B G Y W1 W2 R COMMON FAN COMPRESSOR HEAT FIRST STAGE HEAT SECOND STAGE 24V UNIT CONTROL BOX GROUND WIRE 3 PH POWER UNIT NOTE 1 1 PH POWER B G Y W1 W2 R COMMON FAN COMPRESSOR HEAT FIRST STAGE...

Страница 22: ...Are all covers and access panels in place to prevent air loss and safety hazards NOTE Do not use the PRESSURE CURVES from the unit s SER VICE FACTS to determine the unit refrigerant charge The correc...

Страница 23: ...place and properly fastened Has the owner been instructed on the proper operation and maintenance of the unit Be sure to leave this manual with the owner Final Installation Checklist 1 Check to make s...

Страница 24: ...a 10 minute delay from the time of 1st stage ignition Comfort Control satisfied R and W1 W2 jumped contacts open signaling the control module to close the gas valve and de energize the induced draft b...

Страница 25: ...not store combustible materials gasoline or other flammable vapors or liquids near the unit WARNING Owner Maintenance Some of the periodic maintenance functions of the packaged unit can be performed b...

Страница 26: ...2 through 7 above Take care that all gaskets seat properly 12 Check all wires for correct installation by referring to the unit s electrical wiring diagram in the SERVICE FACTS 13 Leak test all gas li...

Страница 27: ...3 Flashes Pressure switch problem detected Fast Flash Rate Not used 4 Flashes High Limit switch protection device open Steady ON Normal No Call for Heat 5 Flashes Flame sensed and gas valve not energi...

Страница 28: ...com The AHRI Certified mark indicates company participation in the AHRI Certification program For verification of individual certified products go to ahridirectory org The manufacturer has a policy o...

Отзывы: