tousek
/ E_TURN-310UF_43000203 / 19. 03. 2013
- 11 -
4
4c
Before carrying out maintenance works at
the gate-system, the power supply has to
be turned off!
• All pivot- and bearing points have to be greased pe
-
riodically.
• For greasing the pivot point of the operator, the cylindrical
part of the gate driver
(4)
has to be foreseen with a tap
hole. In this tap hole the grease nipple
(4c)
for connection
of a grease gun is inserted.
• At the end of each winter season you should rinse the
operator with warm water.
4. Maintenance of the facility
TURN 310 UF