Meter Selection 
The flow meter must be carefully chosen from the Meter Selection factors in the Engineering Manual.  The meter 
must be selected based on the operating system and  product characteristics.  System variables include flow rate, 
temperature  and  pressure.    The  product  characteristics  include  the  material  compatibility,  lubricity,  viscosity,     
suspensions, pH, and whether the product can congeal, crystallize or leave a dry film.  Failure to select the correct 
flow meter may result in system failure or serious injury. 
 
Air or Vapor Elimination 
In any system where the tank may be completely drained or multiple products manifold into one metering system, 
the possibility of air or vapor being present increases.  The solution is an air or vapor eliminator located before the 
flow meter to vent the air or vapor from the system before it can be measured.  Air or vapor elimination is required 
for all weights and measures regulatory approvals in custody transfer applications. 

System Recommendations 

Control Valves 
Safety and isolation valves should be used throughout the metering system. In any pumping system where there is 
one (1) pump and multiple flow meters, a digital or hydro-mechanical Rate-of-Flow control valve must be used at 
each flow meter to prevent over speeding of the flow meters. 
 
Best Plumbing Configuration 
1)  Flow meter must have secure mounting to a riser or foundation 
2)  The inlet and outlet piping must be securely supported, in a manner to not allow pipe stress on flow meter. 
3)  System should be designed to keep the flow meter full of liquid at all times. 
4)  System  piping  should  have  full  2‖  pipe  diameter  throughout  the  metering  system  to  allow  for  minimal 
 

pressure loss. 

5)  The pipe should be laid out as straight as possible to reduce pressure loss from flow restrictions. 
6)  The meter and piping must be installed in such as way as to avoid accidental draining of the meter. Meter inlet 
 

and outlet should be lower than the associated system plumbing (sump position). 

7)  It is not necessary for the vapor eliminator to be installed directly to the meter.  It can be installed  

upstream 

from the meter.  For effective operation of the vapor eliminator, it should be mounted between   the meter and any 
valves, tees or any other potential places where air or vapor may enter the system. 
8)  The metering system should include a means for calibration. 

 

Protection From Debris 
On new installations, care must be taken to protect the meter from damage during start-up.  It is recommended to 
put a strainer before the meter.  Damage may result from the passage through the meter of dirt, sand, welding slag 
or spatter, thread cuttings, rust, etc.  The insertion of a spool (a flanged length of pipe equal in length to the meter 
and accessories attached to the meter) in place of the meter until the system is flushed, temporarily bypassing the 
plumbing around the meter, will also protect the meter from debris.  Once the system has run ―clean‖ for a period of 
time the meter may be reinstalled or protective devices removed. 
 
Thermal Expansion 
Most liquids will expand and contract with temperature.  This is particularly true for LPG.  In any system where 
there is a chance for liquid to be captured between closed valves without relief, thermal expansion will likely occur 
and create dangerously high pressures within the system.  Care should be taken in designing the system in which 
thermal  shock  may  occur  by  implementing  Pressure  Relief  Valves  or  Thermal  Expansion  Joints  in  the  system     
design.  

Содержание 700-LP Series

Страница 1: ...e on flammable liquid and gas under pressure and must be installed operated maintained and serviced only by qualified personnel fully trained in all safety procedures and applicable federal state loca...

Страница 2: ...ued 33 Re Assembly of Meter Continued 34 Assembly of Strainer 35 Assembly of Air Eliminator 36 Assembly of Differential Valve 37 Assembly of In line Check Valve 38 Meter Trouble Shooting 39 Air Elimin...

Страница 3: ...ings may cause serious injury or damage to the meter The wooden pallets and bases meet the ISPM 15 Guidelines for Regulating Wood Packaging Material in International Trade through the Timber Products...

Страница 4: ...nd operating pressure of the system Because the fluid flowing through the meter is redirected only slightly from its natural flow there is very little pressure drop across the meter unlike other meter...

Страница 5: ...at this step until the product stops draining from the differential valve and discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system This manual provides...

Страница 6: ...the metering system to allow for minimal pressure loss 5 The pipe should be laid out as straight as possible to reduce pressure loss from flow restrictions 6 The meter and piping must be installed in...

Страница 7: ...risers will help reduce or eliminate this problem To compute the shock pressure when a valve is closed quickly recommended to be less than 6 PSI Shock Pressure PSI 63 x Velocity FPS In order to elimi...

Страница 8: ...switches are off and locked out 11 Ensure a flooded suction to the pump so that the system will not starve or cavitate the pump 12 Ensure slow flooding of system Start up system with all shut off valv...

Страница 9: ...th the screws 1 the drive shaft retainer 10 the drive shaft 3 the e ring 4 and the face gear 5 Reinstall the gear on the shaft with the gear teeth facing up Snap the e ring back into place to hold the...

Страница 10: ...Page 10 Meter Dimensions in Inches Millimeters...

Страница 11: ...the prover from meter to meter A detailed description of LP Gas test procedures may be found in the NCWM Course 305 Liquefied Petroleum Gas Liquid Measuring Devices Specifications and Accuracy Tolera...

Страница 12: ...flammable very toxic oxidizing and corrosive Severe injury or fatalities may result if appropriate safety precautions are not followed 6 Before replacing or cleaning filter strainer screen the electri...

Страница 13: ...ssure should not exceed 1 5 times the marked meter pressure It is not recommended to pneumatically test the meter system at anytime 13 If any component of the meter system is removed from the system i...

Страница 14: ...Page 14 700 20 LP Meter Assembly...

Страница 15: ...Support 1 700200 14 Packing Retaining Plate 1 700015 15 Packing Capsule 1 700180 16 O Ring 1 700049 17 3 8 Plug 2 700064 18 Front Cover 1 702505 19 5 16 18 x 1 Grade 8 Bolt 20 702027 20 Rear Cover 1 7...

Страница 16: ...Page 16 730 20 LP Vapor Eliminator Assembly...

Страница 17: ...15 4 Valve Plate Nitrite 2 740206 5 1 4 Hydro Relief Valve 1 740110 6 LPG Air Eliminator Housing 1 740060 7 8 32 x 1 4 Phillip Pan Head 6 740030 8 8 Split Lockwasher 6 740017 9 Retaining Clip 2 740012...

Страница 18: ...Page 18 720 20 LP Strainer Assembly...

Страница 19: ...de 8 Bolt 4 742026 2 Special Spacer 8 702018 3 3 Port Basket Cover 1 742355 4 Seal Ring 1 742024 5 Strainer Basket 100 Mesh 1 742025 6 Top Seal 1 740053 7 Aluminum Strainer Housing 1 742081 8 Flange Q...

Страница 20: ...Page 20 757 20 LP Differential Valve Assembly...

Страница 21: ...m Adapter 1 757010 9 Spring Retainer 1 757005 10 O Ring 1 757025 11 Diaphragm Backup Plate 2 757001 12 Diaphragm 1 757040 13 O Ring 2 757020 14 Diaphragm Poppet 1 757030 15 Seat 1 757015 16 Valve Base...

Страница 22: ...Page 22 782 20 LP In Line Check Assembly...

Страница 23: ...782025 4 Piston Ring 1 782030 5 O ring Main Seal 1 782060 6 O ring 1 782065 7 Special Spacer 1 782080 8 O ring Retainer 1 782040 9 5 16 18 Nylock Nut 1 782085 10 Spring 1 782050 11 Spring Holder 1 78...

Страница 24: ...ews Phillips screwdriver TCS 740030 8 32 316 SS 1 8 1 4 2 4 1 9 Basket Cover 9 16 hex wrench socket TCS 700063 3 8 16 SAE Grade 8 36 29 49 39 Part Number Description Tool Foot Lbs 10 Newton Meter 10 B...

Страница 25: ...wrench TCS 757010 1 2 13 Steel 21 17 28 23 Valve Seat 1 1 4 Hex wrench TCS 757015 3 4 16 Delrin 21 17 28 23 Valve Plug 5 16 Allen wrench TCS 757075 3 8 NPT Forged Steel 1 Lubricate with Loctite 567 2...

Страница 26: ...crometer 3 Note the position of the drive gear either above or below the packing gland pinion Removing the Adjuster 1 Loosen the retaining screws using a standard flathead screwdriver 2 Slide the reta...

Страница 27: ...ocket driver 3 Remove the drain plugs on the front and rear covers using an allen wrench Allow more fluid to drain from the meter Removing Packing Capsule 1 Remove the retaining plate using a standard...

Страница 28: ...otor gear place it between the rotor and blocking gear on the meter 2 Use the socket or box wrench to loosen the right rotor gear lock nut Repeat for the left rotor gear lock nut 3 Move the spare disp...

Страница 29: ...nto the notches near the dowel pins 3 Gently pry the bearing plate off the dowel pins and slide out the bearing plate and rotors from the housing Removing Lock Nuts Rotors 4 Remove rotor lock nuts fro...

Страница 30: ...than what is rated CHAMBER WEAR A Foreign debris similar to sand or sludge has run through the meter B Meter has been operated at a higher capacity and has worn the bearings out allowing rotors to co...

Страница 31: ...ide on blocking rotor gear and position the arrow that it is pointing toward the right displacement gear 2 Align arrow on displacement gear with the arrow on the blocking gear and slide on right displ...

Страница 32: ...turn freely within the housing before proceeding Reinstalling Rotor Gears Lock Nuts 1 Using the spare displacement gear or shop rag position between right displacement gear and blocking rotor gear 2 U...

Страница 33: ...ot on the blocking rotor sleeve Tighten all front cover screws 4 Attach rear cover and tighten all screws Reinstalling Counter Support Adjustor Drive Shaft 1 Position the counter support on the front...

Страница 34: ...r 1 Reinsert the adjustor into the top of the counter support ensuring that it mates with the drive shaft 2 Tighten the screws that secure the adjustor plate to the counter support Reinstalling Dust C...

Страница 35: ...ove imbedded particles If screen is too dirty to clean then replace the screen 6 Wipe clean the face of the cover plate and seal ring Check o rings for damage and replace as needed Reassembly of 720 S...

Страница 36: ...plate 3 Remove valve plate inspect and replace as needed 1 To remove the vapor eliminator assembly remove the four screws and washers attaching it to the strainer 2 Using a flathead screwdriver remove...

Страница 37: ...istance from one another 9 Using the torque specifications on page 25 tighten the 4 bolts 4 down 10 Remove threaded rod 3 fender washer 2 and nut 1 from unit 11 Insert the remaining washers 5 and bolt...

Страница 38: ...ston ring 4 surface 4 Install spacer 7 over shaft of valve housing 3 and over o ring 6 5 Insert o ring 5 into groove of o ring retainer 8 6 Slide o ring retainer 8 over shaft of valve housing 3 7 Usin...

Страница 39: ...ould be used PROBLEM Product flows through meter but register does not operate A Gear train motion interrupted by non functioning gear due to broken pin or key Replace pin or key B If all meter parts...

Страница 40: ...ed and require replacement F The metal reeds may be out of alignment with the seal plate PROBLEM The meter is still registering vapor within the system A The vapor return line is not the required mini...

Страница 41: ...THAN TLV TWA TLV STEL PETROLEUM 64741 65 7 90 0 100MG M3 HYDROCARBON PETROLEUM 64742 53 6 10 0 5MG M3 HYDROCARBON ITEMS NOT SHOWN ARE NOT LISTED IN THE OSHA T S C A HAZARDOUS CHEMICALS LISTING SECTIO...

Страница 42: ...BY EXPOSURE NONE KNOWN PRIMARY ROUTE S OF ENTRY DERMAL INHALATION INGESTION EMERGENCY AND FIRST AID PROCEDURES IN CASE OF EYE CONTACT IMMEDIATELY FLUSH EYES WITH CLEAN WATER FOR AT LEAST 15 MINUTES I...

Страница 43: ...MECHANICAL OR LOCAL TO ASSURE TLV IS NOT EXCEEDED PROTECTIVE GLOVES NORMALLY NOT REQUIRED HOWEVER IF HANDS ARE FREQUENTLY IN FLUID WEAR OIL AND CHEMICAL IMPERVIOUS GLOVES EYE PROTECTION SAFETY GLASSE...

Страница 44: ...I OTHER REGULATORY INFORMATION DOT HAZARDOUS NATURAL DESCRIPTION THE INFORMATION CONTAINED HEREIN IS TO THE BEST OF OUR KNOWLEDGE AND BELIEF ACCURATE HOWEVER SINCE THE CONDITIONS OF HANDLING AND USE A...

Страница 45: ...Page 45 Page 45 NOTES...

Страница 46: ...Page 46 Page 46 NOTES...

Страница 47: ...l purchaser must obtain a Return Goods Authorization RGA number from TCS s customer service department within 30 days of discovery of a purported breach of warranty but not later than the expiration o...

Страница 48: ...excellent customer service support and prompt deliveries TCS meters are designed and manufactured to meet or exceed your needs Our meters are used world wide in a multitude of applications including A...

Отзывы: