![Total Control Systems 700-LP Series Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/total-control-systems/700-lp-series/700-lp-series_installation-operation-and-maintenance-manual_1138832031.webp)
Page 31
Reassembly of Meter
Reinstalling Rotors
1)
Install rear bearing plate on meter.
2) Insert threaded end of blocking rotor and the right displacement rotor into front gear plate (reinsert rotor keys if
necessary).
3) Align the two rotors (see picture 3) before applying gears.
Rotor Gear Timing
1) Slide on blocking rotor gear and position the ‗arrow‘ that it is pointing toward the right displacement gear.
2) Align ‗arrow‘ on displacement gear with the ‗arrow‘ on the blocking gear and slide on right displacement
gear.
3) Rotate the blocking rotor gear toward the left displacement gear and again align ‗arrows‘ and slide on left
displacement gear.
4) Gears and rotors should rotate freely if gears have been installed properly. If so, proceed with starting on the
lock nuts until finger tight.
1
2
3
1
3
2
4
Содержание 700-LP Series
Страница 10: ...Page 10 Meter Dimensions in Inches Millimeters...
Страница 14: ...Page 14 700 20 LP Meter Assembly...
Страница 16: ...Page 16 730 20 LP Vapor Eliminator Assembly...
Страница 18: ...Page 18 720 20 LP Strainer Assembly...
Страница 20: ...Page 20 757 20 LP Differential Valve Assembly...
Страница 22: ...Page 22 782 20 LP In Line Check Assembly...
Страница 45: ...Page 45 Page 45 NOTES...
Страница 46: ...Page 46 Page 46 NOTES...