![Total Control Systems 700-LP Series Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/total-control-systems/700-lp-series/700-lp-series_installation-operation-and-maintenance-manual_1138832030.webp)
Page 30
Inspection of Parts
1)
Inspect the surfaces of rotors, bearing plates, meter housing and gear teeth for any damage or wear.
2) Replace parts as needed.
GEAR WEAR
A) Meter has been run on air (oversped).
B) Meter has been operated at a higher
volume capacity than what is rated.
CHAMBER WEAR
A) Foreign debris, similar to sand or
sludge, has run through the meter.
B) Meter has been operated at a higher
capacity and has worn the bearings
out, allowing rotors to contact the
chamber.
HYDRAULIC SHOCK
A) A valve downstream of the flow meter has abruptly shut off, creating hydraulic shock.
B) Flow meter potentially had large volume of free air flowing within the system, followed by fluid.
Hogged-Out
Keyway
Fractured
Bearing
Содержание 700-LP Series
Страница 10: ...Page 10 Meter Dimensions in Inches Millimeters...
Страница 14: ...Page 14 700 20 LP Meter Assembly...
Страница 16: ...Page 16 730 20 LP Vapor Eliminator Assembly...
Страница 18: ...Page 18 720 20 LP Strainer Assembly...
Страница 20: ...Page 20 757 20 LP Differential Valve Assembly...
Страница 22: ...Page 22 782 20 LP In Line Check Assembly...
Страница 45: ...Page 45 Page 45 NOTES...
Страница 46: ...Page 46 Page 46 NOTES...