RE V. 1.0-12 /16
Pl a st i 350 X P 31
5
UNPACKING & INSTALLATION
5.1 TRANSPORT
5.1.1 t
ransPort
Condition
The machine is delivered covered by protective material for packaging.
5.1.2 v
erifiCation
of
damages
oCCured
during
transPort
Visually check the machine status after removing it from ‘shipping container.
To move the pallet to utilize means and lifting accessories suitable to the weight and comply with current legislation. The lifting
and handling must be performed by qualified personnel trained in this type of operations.
Pay due attention to avoid impacts and rollovers.
Protect the machine from the outside weather.
Any deformation of the visible parts indicate shock suffered by the machine during transport, which could affect normal operation.
5.2 UNPACKING
The information contained in this section shall be observed during periods of temporary storage of the machine that may occur in the
following situations:
•
Delayed installation of the machine, not immediately after the delivery
•
Turning off the machine and its storage, waiting for a relocation
5.2.1 s
torage
features
•
Allowed temperature range: 5 ° C to 35 ° C
•
Range of Acceptable humidity: 30% to 80%
•
Natural and / or artificial adequate lighting
•
Adequate protection from the weather
•
Space required sufficient to perform the lifting and transport safely and easily
•
Flat horizontal surface with a capacity greater than the mass of the machine
•
Space required sufficient to make all the routine maintenance and technical service
5.2.2 u
nPaCkaging
The machine is delivered in its dedicated pallet covered by a carton which preserves machine from damage.
Carefully remove the top cover carton and release the plastic strips that keep the machine fixed on the pallet.
Using a forklift get the machine off the pallet.
WARNING! During unpacking operation please be very carefull in order to avoid damage to the machine or injury to person.
ENG
Ch a P t ER 5: iNsta l l at iON