11
Before test run
• Before turning on the power supply, carry out the following procedure.
1) Using 500V-megger, check 1M
Ω
or more exists between the terminal block 1 to 3 and the earth. If
1M
Ω
or less is detected, do not run the unit. Do not apply to the remote controller circuit.
2) Check the valve of the outdoor unit being opened fully.
• To protect the compressor at activation time, leave power-ON for 12 hours or more be for operating.
How to conduct a test run
CAUTION:
Do not set the switch to the “TEST RUN” position other than for test running.
The air conditioner may be damaged if this switch is set to the “TEST RUN” position for normal operation.
(The receiver unit automatically turns off the air conditioner 60 minutes after the switch has been set to
the “TEST RUN” position to prevent continuous test running.)
Test run
1. Remove the face plate from the receiver unit.
Set the “TEST RUN” switch to the “TEST
RUN” position.
2. Press the
button on the wireless remote
controller to start the operation of the air con-
ditioner.
The
,
, and
lamps each light under test
running.
The temperature cannot be set by the wire-
less remote controller with the “TEST RUN”
switch is set to the “TEST RUN” position.
3. Operate the air conditioner in the “heating”,
“cooling”, or “fan only” mode during test run-
ning.
The outdoor unit will not operate for approxi-
mately 3 minutes after the air conditioner has
been turned on or off.
EN-Book.book Page 11 Monday, June 14, 2004 8:14 PM
Heronhill - for all your Toshiba requirements
Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807