– 140 –
Inverter fixing board
Bundling band
TS sensor
TE sensor
TO sensor
Bundling band
TE sensor
TO sensor
No.
19
Part name
Sensor wiring
process
(Continued)
Procedure
Bind TS sensor, TE sensor and TO sensor with
the bundling band.
Pass TE sensor and TO sensor through upper
part of the inverter fixing board and then bind
them with the bundling band.
NOTE)
Using the bundling band being on the market,
be sure to bind the position which was bound.
Remarks
Содержание RAS-5M34UAV-E
Страница 35: ... 35 4 2 Outdoor Unit RAS 5M34UAV E ...
Страница 37: ... 37 5 2 Outdoor Unit RAS 5M34UAV E POWER SUPPLY CIRCUIT ...