– 133 –
10 Fan guard
1. Detachment
1)Perform work of Detachment 1 of 1 and 2.
CAUTION
Work on the cardboard, cloth, and etc. in order to prevent
damage on the product.
2)Take off the discharge port cabinet and put it as the fan
guard side directs downward.
3)Take off the hooking claws (8 positions) of the fan guard.
2. Attachment
1)Push the hooking claws (8 positions) with hands from the
front side and then fix the claws.
CAUTION
Check all the hooking claws are fixed at each specified
position.
11 Fan guard
1. Detachment
1)Remove the top plate. (Hexagonal screw Ø4 × 10, 6 pcs.)
2)Take off fixing screws for the fin guard and the anchor board.
(Hexagonal screw Ø4 × 10, 3 pcs.)
3)Mount a new fin guard.
No. Part name
Procedure
Remarks
Bell mouth
Discharge
port cabinet
Fan guard
Hooking claw
Fin guard
Fixing screws