January 2000 © TOSHIBA TEC
1 - 47
FC-22 ADJUSTMENT
(7)
When the copier starts operating, a message “WAIT” is shown and the developer material filling
starts (approx. 2 minutes and 30 seconds).
WAIT
(8)
Approx. 2 minutes after the developer material filling is finished, the following display appears:
훾 촞
Y:6.30V
M:6.38V
C:6.38V
K:6.38V
훿 촞
61%
훽 촞
Y:4.00V
M:4.00V
C:4.00V
K:4.00V
Upper line
훾
: Current sensor voltages (V)
Middle line
훿
: Humidity (%)
Lower line
훽
: Target values (V) for adjustment reference voltages
Note:
• The current sensor voltages (V) shown in
훾
automatically changes, gradually approaching the target values
for adjustment reference voltages shown in
훽
.
• Values are displayed only for the developer materials being filled.
(9)
In 30 to 60 seconds, the current sensor voltages (V) in
훾
are converged to those in
훽
. The humidity
shown in
훿
disappears, and the sensor output control values (bit values) are shown instead.
훾 촞
Y:4.00V
M:4.00V
C:4.00V
K:4.00V
훿 촞
Y:
135
M:
135
C:
135 K:
135
훽 촞
Y:4.00V
M:4.00V
C:4.00V
K:4.00V
Note: Be careful that the values in
훽
,
훾
and
훿
vary with humidity.
훽
: Target value (V) for adjustment reference voltage
Humidity (%)
Y
M
C
K
~59.9
4.00
4.00
4.00
4.00
60.0~74.9
4.14
4.14
4.14
4.12
75.0~
4.35
4.35
4.35
4.31
Содержание FC22
Страница 115: ...FC 22 PREVENTIVE MAINTENANCE 2 8 January 2000 TOSHIBA TEC Front side drive system 47 20 ...
Страница 121: ......
Страница 224: ...FC 22 FIRMWARE UPDATING 5 18 January 2000 TOSHIBA TEC Click Finish button then Virtual Modem installation is completed ...
Страница 235: ...January 2000 TOSHIBA TEC 5 29 FC 22 FIRMWARE UPDATING ...
Страница 237: ...FC 22 SERVICE HANDBOOK 6 WIRE HARNESS CONNECTION DIAGRAMS 6 2 DC Wire Harness ...
Страница 238: ...FC 22 WIREHARNESS CONNECTION DIAGRAMS 6 3 January 20000 TOSHIBA TEC ...