January 2000 © TOSHIBA TEC
2 - 3
FC-22 PREVENTIVE MAINTENANCE
General Maintenance Checklist
FC-22
Section
Item to inspect
Cleaning
Coating
Replace every Operation Remarks
1K copies
check
<P-1>
1. Developer material
30
∗
9
2. Doctor blade
(30/60)
>
∗
1
3. Developer unit drum seal
(60)
>
∗
10
4. Front/rear sides of developer unit
(60)
∗
2
5. Oil seal portion
AV
6. Cleaning blade
60
∗
3
<P23-I13>
7. Recovery blade
(60)
>
∗
4
8. Felt seals on both ends of the cleaning blade
(60)
>
9. Entire developer/cleaner unit
(60)
∗
8
10. Main charger case
(60)
∗
7
11. Dischiarge LED
(60)
12. Wire cleaning pad
60
<P22-I21>
13. Main charger wire
60
∗
7
<P22-I15>
14. Main charger grid
60
<P22-I24>
15. Main charger contact
(60)
16. Drum
60
∗
5
<P22-I38>
17. Drum shaft
(60)
18. Drum thermister
(60)
19. Toner recovery auger drive
(60)
W
20. Toner cartridge drive gear
W
21. Ozone filter
60
∗
6
Around-EPU
<P6-I37>
area
22. Toner bag
30
Key-operator’s
item
<P33-I33>
23. Upper fuser roller
90
∗
11
<P27-I17>
24. Lower fuser roller
90
∗
12
<P27-I4>
25. Separation fingers
90
∗
14
<P28-I31>
26. Upper oil roller
30
∗
13
<P28-I56>
27. Upper cleaning roller
30
∗
13
Fuser unit
<P28-I57>
28. Lower oil roller
90
∗
13
<P28-I11>
29. Lower cleaning roller
90
∗
13
<P28-I12>
30. Upper thermistors
A(30)
>
31. Lower thermistors
A(30)
>
32. Fuser roller inlet guide
A(90)
33. Fuser roller exit guide
A(90)
34. Paper exit roller
A
Processing
unit (EPU)
(Only Black
related parts)
Содержание FC22
Страница 115: ...FC 22 PREVENTIVE MAINTENANCE 2 8 January 2000 TOSHIBA TEC Front side drive system 47 20 ...
Страница 121: ......
Страница 224: ...FC 22 FIRMWARE UPDATING 5 18 January 2000 TOSHIBA TEC Click Finish button then Virtual Modem installation is completed ...
Страница 235: ...January 2000 TOSHIBA TEC 5 29 FC 22 FIRMWARE UPDATING ...
Страница 237: ...FC 22 SERVICE HANDBOOK 6 WIRE HARNESS CONNECTION DIAGRAMS 6 2 DC Wire Harness ...
Страница 238: ...FC 22 WIREHARNESS CONNECTION DIAGRAMS 6 3 January 20000 TOSHIBA TEC ...