e-STUDIO200L/202L/203L/230/230L/232/233/280/282/283
© 2004 - 2010 TOSHIBA TEC CORPORATION All rights reserved
PREVENTIVE MAINTENANCE (PM)
4 - 10
[Preventive Maintenance Checklist]
Notes:
• Perform cleaning and lubricating in the following timing. Lubricate the replacement parts
according to the replacement cycle.
e-STUDIO200L/202L/203L: every 64,000 sheets
e-STUDIO230/230L/232/233:every 74,000 sheets
e-STUDIO280/282/283:
every 90,000 sheets
• Values under “Replacement” indicate the replacement cycle for the e-STUDIO200L/
e-STUDIO230/e-STUDIO230L/e-STUDIO280 or e-STUDIO202L(203L)/e-STUDIO232(233)/
e-STUDIO282(283).
• The replacement cycle of the parts in the feeding section equals to the number of sheets fed
from each paper source.
• Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
A. Scanner
B. Laser unit
Items to check
Cleaning Lubrication
Replacement
(x 1,000 sheets)
Operation
check
Parts list
<P-I>
Remarks
A1
Original glass
or A
<P22-I1>
*a1
A2
ADF original glass
<P22-I2>
*a1
A3
Mirror-1
A4
Mirror-2
A5
Mirror-3
A6
Reflector
<P23-I4>
A7
Lens
<P11-I16>
A8
Exposure lamp
Δ
<P23-I6>
A9
Automatic original
detection sensor
<P11-I17>
A10 Slide sheet
(front and rear)
or A
Δ
Items to check
Cleaning Lubrication
Replacement
(x 1,000 sheets)
Operation
check
Parts list
<P-I>
Remarks
B1
Slit glass
10/06