
e-STUDIO2008A/2508A/3008A/3508A/4508A/5008A
© 2015 TOSHIBA TEC CORPORATION All rights reserved
PREVENTIVE MAINTENANCE (PM)
7 - 54
7.12 Machine Refreshing Checklist
Symbols/value used in the checklist
Notes:
•
When performing machine refreshment, check the items in the preventive maintenance
checklist in addition to the items in the machine refreshing checklist.
•
Perform cleaning and lubricating in the following timing. Lubricate the replacement parts
according to the replacement cycle.
•
The value in the “Replacement” field of the table below indicates the replacement number of
output pages in either the black mode.
•
The replacement cycle of the parts in the feeding section equals to the number of sheets fed
from each paper source.
•
Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
•
Parts list <P-I> represents the page item in “e-STUDIO207L/257/307/357/457/507 Service
Parts List”.
Item
Description
Cleaning
A:
Clean with alcohol
B:
Clean with soft pad, cloth or vacuum cleaner
Lubrication / Coating
W1:
White grease (Molykote EM-30L)
W2:
White grease (Molykote HP-300)
Replacement
Value: Replacement cycle
R1: Replacement
R2:
For preventive maintenance, check if the parts are damaged and
replace them as required. If the parts are not replaced at the machine
refreshing interval, inspect them at the subsequent PM.
R3:
Replace if deformed or damaged. If the parts are not replaced at the machine
refreshing interval, inspect them at the subsequent PM.
R4:
Lubrication recommended: If the parts are not lubricated at the machine
refreshing interval, inspect their lubrication status at the subsequent PM.
Operation check
O:
After cleaning or replacement, confirm there is no problem.
Model
Replacement cycle
20ppm
240,000 sheets
25ppm
300,000 sheets
30ppm
360,000 sheets
35ppm
375,000 sheets
45ppm
450,000 sheets
50ppm
450,000 sheets
Items to check
Cleaning
Lubrication
Replacement
(x 1,000 sheets)
Operation
check
Parts list
<P-I>
1
Drum drive unit
W1
R4
-
2
Development drive unit
W1
R4
-
3
Paper feeding drive unit
W1
R4
-
4
Fuser unit drive gear
W1
R4
-
Содержание E-STUDIO2008A
Страница 7: ......
Страница 24: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 12 ...
Страница 26: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved FEATURES 1 2 ...
Страница 384: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved SELF DIAGNOSTIC MODE 5 66 ...
Страница 484: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved SETTING ADJUSTMENT 6 100 ...
Страница 988: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved FIRMWARE UPDATING 11 28 ...
Страница 1002: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved BACKUP FUNCTION 12 14 ...
Страница 1008: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved EXTERNAL COUNTERS 13 6 ...
Страница 1015: ......
Страница 1016: ...1 11 1 OSAKI SHINAGAWA KU TOKYO 141 8562 JAPAN ...