TEST NO. 1: Traction Circuit Charge Pressure
1. Make sure hydraulic oil is at normal operating tem
perature by operating the machine for approximately 10
minutes.
2. Park the machine on a level surface, engage the
parking brake and stop the engine.
To prevent possible personal injury from ro
tating drive shaft, engine must be OFF before
attempting to connect gauge. If gauge has a
hose attached, be careful to route hose so it
will not contact the drive shaft.
CAUTION
3. Connect a 1000 PSI gauge onto charge pressure test
port (Fig. 17).
4. Start the engine and put throttle at full engine RPM
(approx. 3200 RPM) with no load on the system.
GAUGE READING TO BE 150
±
30 PSI.
5. If there is no pressure, or pressure is low, check for
restriction in pump intake line. Inspect charge relief
valve and valve seat. Charge pressure can be adjusted
by changing shim thickness behind the spring. Check
for sheared charge pump key. Disassemble charge
pump and check for internal damage or worn parts.
6. Also take a gauge reading while operating the ma
chine in forward and reverse. Start the engine and put
throttle at full engine RPM (approx. 3200 RPM). Apply
the brakes and push the traction pedal forward, then
reverse.
GAUGE READING TO BE 150
±
30 PSI.
7. If pressure is good under no load, but drops below
specification when under traction load, the piston pump
and motor should be suspected of wear and inefficiency.
When the pump and/or motor is worn or damaged the
charge pump is not able to keep up with the internal
leakage.
1
Figure 17
1. Charge pressure test port
Testing
Page 4 - 26 Rev. B
Reelmaster
®
5100-D
Содержание Reelmaster 5100-D
Страница 2: ...This page is blank ...
Страница 4: ...This page is blank ...
Страница 8: ...Safety Instructions Page 1 4 Reelmaster 5100 D ...
Страница 12: ...Maintenance Interval Chart Maintenance Interval Chart Page 2 4 Rev A Reelmaster 5100 D ...
Страница 32: ...Troubleshooting Page 3 16 Reelmaster 223 D 5100 D ...
Страница 33: ...Reelmaster 223 D 5100 D Page 3 17 Troubleshooting ...
Страница 86: ...Specifications Page 4 2 2 Reelmaster 5100 D ...
Страница 90: ...Hydraulic Schematic Rev A Hydraulic Schematic Page 4 6 Reelmaster 5100 D ...
Страница 154: ...Logic Chart Page 5 2 Reelmaster 5100 D ...
Страница 155: ...Wiring Schematic S N Below 51001 Rev B Reelmaster 5100 D Page 5 3 Wiring Schematic ...
Страница 206: ...Repairs Page 5 48 Rev A Reelmaster 5100 D ...
Страница 230: ...Repairs Page 6 24 Reelmaster 5100 D ...
Страница 304: ...Repairs Page 8 22 Reelmaster 223 D 5100 D 5300 D ...
Страница 317: ...This page is blank ...
Страница 318: ...Commercial Products The Toro Company ...