g033591
Figure 127
1.
Manifold (master-boom
valve)
4.
Flanged-head bolt (1/4 x
3/4 inch)
2.
Valve mount
5.
Retainer
3.
Flanged locknut (1/4 inch)
6.
Socket (90° outlet fitting)
6.
Secure the outlet fitting coupling fitting by
inserting a retainer into the socket of the outlet
fitting (
7.
Assemble the agitation valve to the valve mount
with the flanged-head bolt and flanged locknut
(
) that you removed in step
of
Removing the Master Boom Manifold Valve
(page 79)
and torque the nut and bolt to 10 to 12
N∙m (90 to 110 in-lb).
Installing the Section Manifold
Valve
1.
Insert the upper end-cap fitting of the manifold
valve into the bypass fitting (
A).
Note:
If needed, loosen the mounting hardware
for the bypass fitting to provide clearance.
g033609
Figure 128
1.
Flange (reducer coupling)
6.
Socket (outlet fitting)
2.
Socket (bypass fitting)
7.
Retainer
3.
Bypass fitting
8.
Flange (manifold—section
valve)
4.
Flange (adjacent
manifold—agitation valve)
9.
Gasket
5.
End-cap fitting (manifold
valve assembly)
10.
Flange clamp
2.
Secure the end-cap fitting to the bypass fitting
by inserting a retainer into the socket of the
bypass fitting (
A).
3.
Assemble the outlet fitting onto the lower
end-cap fitting of the manifold valve (
4.
Secure the end-cap fitting to the outlet fitting by
inserting a retainer into the socket of the outlet
fitting (
5.
Align a gasket between the flanges of the
reducer coupling and the section valve manifold
(
B).
6.
Assemble the reducer coupling, gasket, and
section valve manifold with a clamp and tighten
by hand (
B).
7.
If installing the 2 left most section valves, align
a gasket between the flanges of the 2 adjacent
section valve manifolds (
8.
Assemble the 2 adjacent section valve manifolds
and gasket with a clamp and tighten by hand
(
B).
85
Содержание Multi Pro WM
Страница 91: ...Schematics g209531 Flow Diagram Sprayer System Rev B 91...
Страница 92: ...Notes...
Страница 93: ...Notes...
Страница 94: ...Notes...