
5.
Using the center hole in the heat shield as a
template, drill a hole (7/32 inch) into the muffler
guard (
).
6.
Use the thread-forming bolt (1/4 x 1-1/4 inch)
and washer to install the spacer between the
heat shield and muffler guard (
).
g256854
Figure 11
1.
Thread-forming bolt (1/4 x
1-1/4)
3.
Spacer
2.
Washer
7.
Torque the 3 thread-forming bolts to 4.5 N∙m
(40 in-lb).
Note:
Do not torque the carriage bolt at this
time.
8.
Install the air-cleaner filter and cover.
9.
Use a carriage bolt (3/8 x 2-1/4 inches) and nut
(3/8 inch) to install the bushing assemblies to
the machine (
). Torque the bolt to 37
to 45 N∙m (27 to 33 ft-lb).
Note:
The rubber flange of the bushing should
face toward the inside of the machine as shown
in
g250302
Figure 12
1.
Carriage bolt (3/8 x 2-1/4
inches)
3.
Nut (3/8 inch)
2.
Bushing assembly
4.
Rubber flange
9