1
Setting Up the Machine Base
Model
Parts needed for this procedure:
1
Hopper guard
3
Button head bolt, 1/4 x 5/8 inch
3
Lock nut
Procedure
1.
Remove the base model machine from the shipping
crate.
2.
At the rear of the twin spinner, remove the bolt and nut
attaching the machine lifting device shipping bracket to
the twin spinner (
).
Figure 3
1.
Shipping bracket
3.
At the front of the twin spinner, remove the 2 bolts
and nuts attaching the machine lifting device shipping
bracket to the Twin Spinner (
Figure 4
1.
Shipping bracket
4.
This step requires two people. Lift the twin spinner
out of the hopper using the twin spinner outer grab
handles. Place the twin spinner unit on the ground
(
Figure 5
1.
Twin spinner
5.
Remove the 4 screws from the legs of the twin spinner.
With the help of a partner, lift the twin spinner and
remove the packing studs and packing foam (
).
10