6
Chemicals are hazardous and can cause
personal injury!
Securely tighten all sprayer hose clamp
connections during initial set-up to
prevent leaks and hose blow-offs while
spraying system is in operation.
CAUTION
FIG. 9
1. Boom Center Section 3. Boom Extension
2. Extension Boom
4. Retainer Ring
Feed Hose
HOSE CONNECTIONS:
1.
Connect the 3 hoses for the Center Boom to the
Center Flow Monitor so that the monitor indicators
correspond to the Spray Nozzles on the Center
Boom (i.e. left nozzle on left flow indicator, etc.).
2.
Tie hoses together and then secure to the lower
part of the Flow Monitor Mount with a tie strap so
that the weight or movement of the hoses does
not put any strain on the Flow Monitor.
NOTE: The Boom Control Valves must be
installed on the sprayer before the rest of the
hose connection step can be completed. The
Boom hose connection will depend on the type
of Control Valve system used on the Sprayer.
Refer to the applicable SPRAY SYSTEM SET-
UP AND PARTS MANUAL for the Control Valve
installation.
SPRAYERS WITH ELECTRIC SOLENOID
CONTROL VALVE SYSTEM:
1.
Connect the 34" length of 3/4" Hose included
with the Enclosed Boom to the inlet on the Center
Boom Flow Monitor and the other end to the outlet
on the center Solenoid Valve. Secure with Hose
Clamps.
2.
Connect the Boom Feed Hoses for the Left and
Right Boom Extensions to the outlets on the
Solenoid Control Valves so that the Boom Feed
Hoses supply the corresponding boom sections
controlled by the Boom Control Switches / Solenoid
Control Valves. Secure with Hose Clamps.
SPRAYERS WITH MANUAL CONTROL VALVE
SYSTEM:
1.
Connect the Feed Hose from the Manual Control
Valve for the Center Boom to the inlet for the Center
Boom Flow Monitor, trimming excess hose.
2.
Insert the (2) 3/4" Hose Connectors supplied with
the boom into the Feed Hoses for the Left and Right
Booms. Secure with Hose Clamps. Connect the
Feed Hoses coming from the Left and Right Boom
Control Valves to the Hose Connectors, trimming
excess hose, but allowing enough hose length for
boom movement. Secure with Hose Clamps.
NOTE: The Flow Monitor Swivel Nuts should
be tightened at this time. Be Careful not to
overtighten.
3.
Unfold the booms and insert into Breakaway
Latches to put in field position.
FIG. 10
1. Boom Center Section
3. Boom Extension
2. Boom Extension Feed Hose
2
3
1
2
1
2
4
3
2.
Route Right and Left Boom Feed Hoses as
shown in FIG. 9 and FIG. 10 through retainer ring
at the Boom Extension Pivot Joint and through
Center Boom section ensuring that there is
adequate hose length at the Boom Extension Pivot
Joint so that the hose is not stretched.
!
Содержание 41355
Страница 14: ...14...
Страница 19: ...19 NOTES...
Страница 20: ...20 Front Center Boom Right Boom Left Boom DRIFT SEAL RETAINER DRIFT SEAL AND TRIM GROUP...
Страница 32: ...32...
Страница 33: ...33 NOTES...
Страница 34: ...34 NOTES...
Страница 35: ...35 Helping you put quality into play T O R OR R...