10
FIG. 17
1. Split Eyelet Connector 3. Foam Marker Hose
2. Hood Opening
4. Boom Extension
Feed Hose
5"
1
2
4
3
Drill
hole
2.
Drill 5/8" hole in the plastic shroud 1" over from
the Boom Feed Hose on each Boom Extension.
3.
Additional hose is required to install the Foam
Marker on the
ENCLOSED BOOM
which is
included with the
ENCLOSED BOOM
. Connect
the 78" length of 3/8" Hose supplied with
ENCLOSED BOOM
to the Split Eyelet Connector
on the boom, secure with Hose Clamp provided
with
FOAM MARKER KIT
. Route the Hose with
the Right and Left Boom Feed Hose to the front of
the Center Boom, securing Foam Marker Hose to
Boom Feed Hose and Actuator Wire Harness with
Plastic Ties, ensuring that Ties do not squash
Hoses.
4.
Connect to Foam Marker Boom Feed Hoses
coming from Compressor using (2) 3/8" Hose
Connectors and (4) Hose Clamps supplied with
the
ENCLOSED BOOM
.
RINSEATE NOZZLE MOUNT:
NOTE: If the INJECTOR-PRO
TM
SYSTEM is
being installed, the Rinseate Nozzle must be
mounted on the Center Boom section Left
Castor Mount as per the following instructions:
1.
Assemble the Rinseate Nozzle Mounting Bracket
on to the Left Castor Mount of the Center Boom as
per FIG. 18. Assemble the Rinseate Nozzle, 1/2"
Female Pipe Coupling and 1/2" 90
0
Male Hose
Coupling included with the Enclosed Boom
Mounting Kit. (refer to the Single Nozzle Assembly
in the INJECTOR-PRO
TM
SYSTEM PARTS
MANUAL). Mount Nozzle Assembly onto Mounting
Bracket using (1) R-Clamp and 1/4" x 3/4" hex hd.
cap screw, flat washer, lock washer and nut.
1"
5.
Connect the male three pin connector on the
main Wiring Harness to the Female plug on the
Brake Controller wiring harness.
6.
Connect the Red Wire Ring Terminal connector
to the same terminal as the red Power Wire located
at the lower rear of the Starter Solenoid.
NOTE: Ensure that the terminal you are
connecting to is the one directly connected to
the battery and has 12 volts (nominal) at all
times.
Connect the Black Wire Ring Terminal to the
5/16" x 3/4" Hex Hd. Cap Screw located at the lower
right hand corner of the Left Hand Side Panel. (Also
refer to the MULTI-PRO
®
1100 Parts Manual)
7.
Secure the Wire Harness, with plastic cable ties,
to the Vehicle Frame.
8.
Replace Rear Panel on Steering Console and
reinstall (4) 1/4" x 5/8" washer hd. cap screws.
ELECTRIC
BRAKE
WIRING
CONNECTION:
1.
Route the wiring harnesses coming out of the
back of the Left and Right Brakes along the Boom
Mounting Bracket and the square tube on the front
of the Center Boom. Connect to the two pin
Connector Plugs at the back of the right side of the
Vehicle.
NOTE: The Connector for the Right Brake has
the Orange & White wire. The Connector for
the Left Brake has an Orange wire.
Confirm that the plugs are connected correctly by
stepping on the brake pedal and observing the
Brake Operation Indicator Lights on the Brake
Controller. The lights will only come on if power is
flowing to the brake.
IMPORTANT: Readjust the Brake Switch
position if necessary so that the Electric
Brakes engage as soon as the Brake Pedal is
pressed. The Electric Brakes should engage
before the vehicle brakes.
FOAM MARKER OPTION:
NOTE: The installation of the optional Foam
Marker on the ENCLOSED BOOM requires
that one alternative step, and one additional
step be done when compared to the SET-UP
AND PARTS LIST included with the FOAM
MARKER KIT for use on the MULTI-PRO
®
1100
VEHICLE.
Follow the instructions included with the
FOAM MARKER KIT except for the applicable
steps as follows:
1.
The installation of the Foam Marker with the
EXTENSION BOOM
on the
MULTI-PRO
®
1100
requires that the
9/32"
hole, which must be drilled
in the Right and Left Boom Pipes, be located on
the
bottom
side of the tube
5" over from the hood
opening
as per FIG. 17.
Содержание 41355
Страница 14: ...14...
Страница 19: ...19 NOTES...
Страница 20: ...20 Front Center Boom Right Boom Left Boom DRIFT SEAL RETAINER DRIFT SEAL AND TRIM GROUP...
Страница 32: ...32...
Страница 33: ...33 NOTES...
Страница 34: ...34 NOTES...
Страница 35: ...35 Helping you put quality into play T O R OR R...