7.
Locate and remove the 2 knockout plugs from the top
of the control panel (
Figure 28
1.
Knockout plugs
2.
Knockout plug locations
8.
Carefully cut and remove the decal material to expose
the holes in the control panel.
Note:
Remove only the knockout plugs and decal
material for the required switches.
9.
Deburr the newly exposed edges of the control panel.
10.
Clean the control panel surface and affix the decal
around the exposed holes (
).
Figure 29
1.
Decal
3.
Lift/lower switch
(3-position switch)
2.
Float/power-down switch
(2-position switch)
11.
Insert the switches into the appropriate mounting holes
(
).
Note:
Position the flat portion of the switch toward
the operator.
7
Installing the Wiring Harness
Parts needed for this procedure:
1
Wiring harness
Procedure
Note:
The machine must be equipped with the Auxiliary
Power Unit Kit, Toro part no. 30382.
1.
Cover exposed connectors on the wiring harness with
masking tape or electrical tape to keep debris out of the
connectors while routing the harness.
2.
Route and connect the wiring harness (
and
) at the follows locations:
•
Hydraulic-manifold connectors
•
Relays (6) on the relay bracket
•
Main harness connector, located under the right
operator controls by the standard control module
Note:
The main harness connector is a 2-wire
Metri-pak connector (brown and tan wires)
•
Deck lift in A and B
Note:
Unplug the 2 connectors from the
lift-manifold block and plug them into the wiring
harness.
•
Deck lift out A and B
Note:
Plug the wiring harness into the lift-block
manifold where you just unplugged the 2
connectors.
•
Pink power-wire connector
•
Ground to the ground block
•
Lift/lower switch
•
Float/enable switch
3.
Secure the wiring harness to the machine with cable
ties.
Important:
Keep the harness away from all hot,
sharp, or moving parts.
Important:
Secure the wiring harness away from
the tail pipe of the machine.
12