background image

To increase the gap, shorten the rod.

To decrease the gap, lengthen the rod.

C.

Install the rod with the bolt and the locknut, and
test the clearance again.

D.

Repeat this procedure until the gap is correct.

3.

Tighten the locknuts that secure the spring rod until
1/4 to 1/2 inch (6 mm to 13 mm) of the threads are
showing to apply tension to the spring (Figure 19).

Figure 20

1.

1/4 to 1/2 inches of threads showing (6 mm to 13 mm)

Note:

Adjusting the spring rod will vary the lift effort

of the system; the longer the bolt ends, the easier it will
be to lift the toolbar. Adjust the springs so that the
lift force is comfortable. The greater the tension on
the assist spring, the less ground pressure there will be
on the toolbar.

4.

Install the right-hand wheel shroud.

5.

Install the rear tires and remove the blocks from under
the rear of the machine.

Note:

Torque the lugs nuts to 45 to 55 ft-lb (61 to

75 N-m).

9

Adjusting the Toolbar
Transport Height

No Parts Required

Procedure

1.

Position the lift handle to the transport position (upper
most notch).

2.

Rotate the eccentric bolt either direction until the
toolbar tines are parallel to the notch in the lift arm
(Figure 17 and Figure 21).

Important:

The eccentric bolt will not rotate 360

degrees. When it stops, do not attempt to force
it further or you will damage it. Instead, rotate it
back the other direction.

Figure 21

1.

Desired position, parallel
to the lift arm notch

2.

Notch in the lift arm

3.

Torque the center pivot bolt (item 4 in Figure 13) to
175 to 225 inch-lb (20 to 25 N-m).

4.

Tighten the nut that secures the eccentric bolt until it
is secure, but do not over-tighten it.

5.

Test the operation of the attachment.

10

Leveling the Toolbar

Parts needed for this procedure:

1

Shim (Part no. 110-7379)

1

Shim (Part no. 110-7380)

1

Shim (Part no. 110-7381)

Procedure

Once the toolbar has been installed and the fasteners are
tightened, use the following procedure to verify that the
toolbar teeth are level:

1.

Park the machine on a level surface.

2.

Check the pressure of all tires and ensure that they
are equal. Refer to the Operator’s Manual for more
information on checking the tire pressure.

3.

Lower the toolbar until the teeth just begin to make
contact with the ground.

4.

If the teeth of the toolbar contact the ground evenly,
the toolbar is level.

Note:

If the teeth on one side of the toolbar contacts

the ground before the other side, level the toolbar.
Continue leveling by following the remainder of this
procedure.

10

Содержание 08731

Страница 1: ...hes 2 Thin locknut 1 2 inch 2 Detent plate 1 2 Knob 1 Install the scarifier lift handle assembly Pivot tube 1 Extension spring 1 Spring rod 1 Pivot tube bracket 2 Bolt 3 8 x 3 inches 4 Locknut 3 8 inc...

Страница 2: ...quired Procedure Note If you will be installing the spring tine toolbar install the pivot tube brackets supplied with the spring tine toolbar instead of the ones supplied with this attachment Refer to...

Страница 3: ...p If you use the thick ones they will not lock on and will eventually fall off Note The handle assembly is installed through the bottom of the traction unit by guiding the handle up through the openin...

Страница 4: ...on 1 Connect the extension spring to one of the spring levers on the pivot tube and to the spring rod Figure 5 Figure 5 1 Locknut 3 8 inch 5 Extension spring 2 Pivot tube bracket 6 Spring rod 3 Bolt 3...

Страница 5: ...secure it with a locknut 1 2 inch Figure 7 Note You can move the pivot tube up or down in its brackets to gain clearance for mounting the adjustable rod 4 Move the lift handle all the way downward to...

Страница 6: ...h a bolt 5 16 x 1 inch and a locknut 5 16 inch Note The saddle stud should point inward Figure 10 Note Position the saddles as shown in Figure 10 Figure 10 1 Bolt 5 16 x 1 inch 3 Lift arm 2 Saddle 4 L...

Страница 7: ...nstalling the Toolbar Lift Pedal Parts needed for this procedure 1 Lever assembly 1 Bolt 5 16 x 2 inches 3 Locknut 5 16 inch 1 Pivot tab 1 Toolbar link 1 Carriage bolt 3 8 x 1 1 4 inches 1 Spacer 1 Wa...

Страница 8: ...the pedal lever assembly and secure it with a retaining ring Figure 15 Figure 15 1 Toolbar link 4 Retaining ring 2 Pedal lever assembly 5 Washer 7 8 inch 3 Lever assembly 4 Install the post on the ot...

Страница 9: ...Tension and the Adjustable Rod Assembly No Parts Required Procedure 1 Position the lift handle in the top detent position 2 Measure the distance between the traction unit frame and the pivot tube as...

Страница 10: ...e notch in the lift arm Figure 17 and Figure 21 Important The eccentric bolt will not rotate 360 degrees When it stops do not attempt to force it further or you will damage it Instead rotate it back t...

Страница 11: ...to the left raise it and then slide it to the right into the desired detent position To raise and lock the toolbar into the transport position move the lift handle to the highest position and press t...

Страница 12: ...2 Spring sleeve casting Use the following table and figure as a guide for adjusting the downward toolbar pressure Figure 24 Spring Force Chart Dimension inches Force pounds 3 00 238 2 88 335 2 75 430...

Страница 13: ...embly to the scarifier mount assembly refer to the Parts Catalog for parts illustration Tighten the nut until it is snug and then back them off slightly to allow for free rotation 1 The eccentric bolt...

Страница 14: ...Notes 14...

Страница 15: ...Notes 15...

Страница 16: ...ed to damage to seats due to wear or abrasion worn painted surfaces scratched decals or windows etc Parts Parts scheduled for replacement as required maintenance are warranted for the period of time u...

Отзывы: