
Steering/Lift/Sidewinder Circuit Testing − Steering Control Valve
and Steering Cylinder Test (continued)
B. When steering wheel is released, steering control should return to the
neutral position with no additional turning.
4. If either of these performance tests indicate a steering problem, determine if
the steering cylinder is faulty using the following procedure.
A. Park the machine on a level surface with the cutting units lowered, PTO
switch in the disable position, and the parking brake engaged.
B. With the engine running, turn the steering wheel to the left
(counterclockwise) until the steering cylinder rod is fully extended and
turn the engine off.
C. Read
Precautions for Hydraulic Testing (page 5–27)
.
D. Remove the hydraulic hose from the fitting on the rod end of the steering
cylinder. Plug the end of the hose removed.
E. With the engine off, continue turning the steering wheel to the left
(counterclockwise) with the steering cylinder fully extended. Observe the
open fitting on the steering cylinder as the wheel is turned. If hydraulic
fluid comes out of the fitting while turning the steering wheel to the left, the
steering cylinder has internal leakage and must be repaired or replaced.
F. Remove plug from the hydraulic hose and reconnect the hose.
5. If steering problem exists and steering cylinder passed test, perform the
Steering/Lift/Sidewinder Circuit Testing − Gear Pump (P2) Flow Test (page
5–55)
and
Steering/Lift/Sidewinder Circuit Testing − Relief Valve Pressure
to make sure that the steering control valve and cylinder
are receiving adequate fluid flow and pressure. Based on the results of these
tests, repair or replace steering control valve as necessary (see
Control Valve (page 5–133)
and
Servicing the Steering Control Valve (page
).
Reelmaster
®
3100-D/3105-D
Page 5–61
Hydraulic System: Testing
20252SL Rev A
Содержание 03200 Reelmaster 3100-D
Страница 4: ...NOTES NOTES Page 4 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 6: ...g341979 Figure 1 Preface Page 6 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 10: ...Preface Page 10 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 20: ...Safety Safety and Instructional Decals Page 1 10 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 44: ...Specifications and Maintenance Special Tools Page 2 24 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 88: ...g344528 Figure 28 Hydraulic System Hydraulic Schematic Page 5 12 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 89: ...g344526 Figure 29 Reelmaster 3100 D 3105 D Page 5 13 Hydraulic System Hydraulic Schematic 20252SL Rev A ...
Страница 198: ...g345756 Figure 95 Hydraulic System Service and Repairs Page 5 122 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 204: ...g345782 Figure 99 Hydraulic System Service and Repairs Page 5 128 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 224: ...Hydraulic System Service and Repairs Page 5 148 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 308: ...Wheels Brakes and Chassis Service and Repairs Page 7 30 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 376: ...Universal Groomer Optional Service and Repairs Page 9 22 Reelmaster 3100 D 3105 D 20252SL Rev A ...
Страница 382: ...Page A 6 20252SL Rev A Reelmaster 3100 D 3105 D Drawing 122 1522 Rev A Sheet 1 of 1 Electrical Schematic g346835 ...
Страница 383: ...Reelmaster 3100 D 3105 D Drawing 122 1523 Rev B Sheet 1 of 2 20252SL Rev A Page A 7 Wire Harness Drawing CV g346834 ...
Страница 384: ...Page A 8 20252SL Rev A Reelmaster 3100 D 3105 D Drawing 122 1523 Rev A Sheet 2 of 2 Wire Harness Drawing g346833 ...
Страница 385: ......