
Topsoaring New Technology Co., LTD
Top Sky DLG Install Guide
TopskyInstallGuide-(English version).doc
Page 9 of 40
1.21.
With a ruler, make the vertical tail be vertical to the desk.
1.22.
With the scale mark, adjust the stabilizer and the mount. When the stabilizer is flat on the desk,
the hinge of the elevator is vertical to the tail boom.