
Topsoaring New Technology Co., LTD
Top Sky DLG Install Guide
TopskyInstallGuide-(English version).doc
Page 8 of 40
The vertical tail should be vertical to the stabilizer.
The vertical tail should be on the same surface as the center line of the fuselage.
The hinge of the vertical tail should be vertical to the center line of the tail boom.
1.18.
Temporarily join the vertical tail and the tail boom with tape. Then bond the tail boom and the
vertical tail from both sides using the provided fiberglass and 30min epoxy.
1.19.
Lay the fuselage flat on the desk, with the vertical tail up side down.
1.20.
Adjust the center line of the tail boom, to make it parallel to the desk surface and also parallel to
the scale mark on the working board.