
Topsoaring New Technology Co., LTD
Top Sky DLG Install Guide
TopskyInstallGuide-(English version).doc
Page 7 of 40
1.13.
Then, cover the other side. The weight of tail set with films should be 14g.
1.14.
Cut the covering of both sides of the vertical tail: 2mm inside the edge of the carbon, cut from
the front to the end of the tail boom.
1.15.
Bond the tail boom and the vertical tail, with fiberglass and epoxy.
1.16.
Cut the covering of the stabilizer: 2mm inside of the carbon.
1.17.
Fix the tail on your working board. Check the joint:
The stabilizer should be parallel to the center line of the tail boom, or it may have an angle of
-1 degree.
The hinge of the elevator should be vertical to the tail boom.
The center line of the tail boom should be right in the middle of the stabilizer.