
Topsoaring New Technology Co., LTD
Top Sky DLG Install Guide
TopskyInstallGuide-(English version).doc
Page 23 of 40
4.6.
Measure the length of the link rod and z-bend the supplied steel wire into the same length.
4.7.
Install the aileron link rod.
4.8.
Test the aileron servos by powering on the receiver. Then power off the receiver. Adjust the
arms to center the ailerons.
4.9.
Bond the servos and arms with epoxy. Waiting for the wing to cure.
5.
Fuselage device installation
5.1.
Put in batteries and receiver. Install the servos as forward as possible without affecting the battery