SOL-96.110.081 / 260422
TOPAZ Iron
Startup
25
4.3. Priming the Reagent Tubes
Note:
• Before priming the reagent tubes, make sure that the sample
inlet tap is open.
• To avoid chemical reactions in the photometer, fill the reagent
tubes one after the other, not simultaneously.
Enter the
Electrical test
menu
1
Turn the power switch to the ON position.
The peristaltic pumps are automatically readjusted and the
panel PC starts.
2
Stop the measuring cycle by pressing the button and entering
the password “0712”.
3
Open the <TOOLS> tab and press the <Electrical test> button.
Check
reagent tubes
To check the flow through the reagent tubes, perform the following
steps:
4
Open the <ACTUATOR> tab and set “SV Filling” to <ON>.
MEASURE
DIAGNOSTIC
+
TOOLS
Maintenance
Electrical test
Maintenance
Maintenance
Electrical test
ON
ON
ON
ON
OFF
OFF
OFF
OFF
Stirrer
SV Emptying
Heating
SV Filling
ACTUATOR
4-20mA OUTPUT
PUMPS
RELAYS
INPUTS
Vessel temperature :
27.48 °C