Installation
13
3.
Installation
3.1. Before Installation
Unpacking
Carefully unpack the analyzer and check it for visible damage.
On-site
requirements
Verify the electrical and hydraulic connections available at the instal
-
lation site against the requirements in
Instrument Specifications, p. 9
.
3.2. Mounting the Wall Cabinet
Mounting
requirements
Mount the instrument in vertical position. The display should be at
eye level to simplify operation and maintenance.
For dimensions see drawing on
.
Reagent
bottles
Reagent bottles must be stored outside the analyzer. Provide a
suitable storage area near the analyzer.
As an option, a reagent shelf is available that can be installed directly
below the analyzer.
3.3. Hydraulic Connections