BP209 Series
7 Operation Instructions
Page 94
21424-D02
·
Align the beam position using the controls of your laser source. Subsequently click the cap-
ture button of Position 1 and 2, observe the alignment, and improve it until all four alignment
criteria are fulfilled (bulbs must be at least yellow):
Well aligned beam position
·
To toggle between the two positions, the movement of the stage between the two stop po-
sitions can be controlled automatically by the software. Just push the
loop button
and
enter a convenient dwell time value. The stage starts a loop move, dwelling at the stop po-
sition for the given time. During the dwelling a realignment can be made. Please keep in
mind, that the numeric alignment indicators are being updated only after the next move.
Содержание M2MS
Страница 2: ...Copyright 2022 Thorlabs Version Date 8 1 14 Feb 2022 ...
Страница 73: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 71 Example ...
Страница 92: ...BP209 Series 7 Operation Instructions Page 90 21424 D02 ...
Страница 119: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 117 ...
Страница 151: ...BP209 Series 11 Appendix Rev 8 1 14 Feb 2022 2022 Thorlabs Page 149 Typical Responsivity Extended InGaAs Photodiodes ...
Страница 154: ...BP209 Series 11 Appendix Page 152 21424 D02 11 7 Drawing BP209 Drawing BP209 Series Imperial Version ...
Страница 155: ...BP209 Series 11 Appendix Rev 8 1 14 Feb 2022 2022 Thorlabs Page 153 Drawing BP209 Series Metric Version ...
Страница 157: ...BP209 Series 11 Appendix Rev 8 1 14 Feb 2022 2022 Thorlabs Page 155 11 9 Drawing BP209 Mounting Adapter ...
Страница 158: ...BP209 Series 11 Appendix Page 156 21424 D02 11 10 Drawing M2MS BP209 ...
Страница 162: ...BP209 Series 11 Appendix Page 160 21424 D02 11 14 Certifications and Compliances ...
Страница 167: ...www thorlabs com ...