1
1
Introduction
The following serves as a guide and overview of the installation, startup and
operation of a TraceNet TCM2 heat tracing control and monitoring system. This
guide shall be used in conjunction with the project specific control system
drawings and any other standard installation instructions/guides provided. In the
unlikely event that a conflict or uncertainty arises, contact the Thermon
engineering support personnel assigned to this project to clarify.
1.1 The Panel Location
A wide variety of TraceNet TCM2 system configurations are possible. The TCM2
control panels are designed to operate in ambients ranging from -40°F (-40°C) to
104°F (40°C) and higher. TraceNet TCM2 heat trace control and monitoring
systems have been approved/certified for installation and operation in
ORDINARY LOCATIONS and CLASS I, DIV 2, GROUPS B, C, D, T4
HAZARDOUS LOCATIONS ONLY, Installation Category II, at altitudes up to
2000 m, and in locations where the Mains supply voltage can fluctuate up to
10%. The actual markings provided on the panel will detail the specific location
requirements for each design. The module may be used in pollution degree 2 or
better.
1.2 Initial Inspection and Handling
Upon receiving the TraceNet TCM2 control panel, it is important to confirm that
the contents of the shipping containers agree with the shipping documents and
with the purchase order. Also, it is important to check the shipped container
exterior and packing materials for any possible freight damage. Where damage is
observed, take photos and notify the carrier as well as your nearest Thermon
engineering support center before proceeding further.
After carefully removing the panel from its shipping container, move the panel to
its selected location, either by utilizing the pallet base and the securement
strapping provided (using a lift truck/fork lift in the case of large panels), or by
lifting and mounting to a wall/rack for smaller panels. Where lifting eyes are
provided on the panel, they should be used when handling.
Where the panel has external heat sinks to dissipate the heat generated by solid
state relay switching, it is recommended that a minimum of 6” (150 mm) of
All installation personnel should be properly trained and qualified to safely install,
service and program this TraceNet heat tracing control panel as well as to operate
the associated heat tracing system. Service shall only be performed by a certified
technician. Equipment is located in enclosures whose doors can only be opened
through use of a tool.
Содержание TraceNet TCM2
Страница 1: ...TraceNetTM Control and Monitoring System TCM2 Installation Start Up Operating and Maintenance Guide ...
Страница 2: ......
Страница 40: ...35 11 Notes ...
Страница 57: ......