2
clearance be allowed between heat sinks and walls or other panels to minimize
heat buildup at the heat sinks.
Where heat sinks are present on adjacent panels, allow 12” (300 mm) clearance
between heat sinks for sufficient natural air movement.
Adequate door clearance for service work entry and conduit panel entries should
be anticipated when establishing the exact panel location. The panel should be
positioned such that the operator can easily access any disconnecting breakers
or fuses. When the panel is located outdoors, the panel should be located at a
sufficient height to avoid potential standing water.
Once the panel has been properly located, refer to the project specific installation
details for the recommended floor mounting as well as wall mounting details.
Once bolted in place, the panel is ready for final configuration, wiring, and site
required assembly. Note that the TCM2 control and monitoring module is
normally shipped in special packaging to minimize any undue impact stress
during shipment. It should be removed from its packaging being attentive to any
shipping damage that may have occurred during its transit.
Warning: Heat Sink Temperatures May Exceed 60°C
WHEN USED IN A HAZARDOUS LOCATION THE FOLLOWING WILL APPLY.
WARNING – EXPLOSION HAZARD – DO NOT DISCONNECT EQUIPMENT
UNLESS POWER HAS BEEN SWITCHED OFF OR THE AREA IS KNOWN TO BE
NON-HAZARDOUS
AVERTISSEMENT – RISQUE D’EXPLOSION – AVANT DE DÉCONNECTER
L’EQUIPEMENT, COUPER LE COURANT OU S’ASSURER QUE L’EMPLACEMENT
EST DÉSIGNÉ NON DANGEREUX
WARNING – EXPLOSION HAZARD – SUBSTITUTION OF COMPONENTS MAY
IMPAIR SUITABILITY FOR CLASS I, DIVISION 2
AVERTISSEMENT – RISQUE D’EXPLOSION – LA SUBSTITUTION DE
COMPASANTS PEUT RENDRE CE MATÉRIEL INACCEPTABLE POUR LES
EMPLACEMENTS DE CLASSE I, DIVISION 2
Содержание TraceNet TCM2
Страница 1: ...TraceNetTM Control and Monitoring System TCM2 Installation Start Up Operating and Maintenance Guide ...
Страница 2: ......
Страница 40: ...35 11 Notes ...
Страница 57: ......