18
4.
INSTALLATION
The commissioning of the system must be carried out by the personnel
authorized by ThermoFLUX d.o.o or the importer.
The warranty will not be valid if the boiler has not been commissioned
by an authorized servicer.
The first start-up includes the basic operation and maintenance of the boiler. The service
technician authorized for the first commissioning must check the functioning of the boile at
least during one complete work cycle. In some countries, it is obligatoy for first
commissioning to be controled and autorizied by
chimney sweep
or a person authorized
to control.
Risk of material and physical damage due to improper
commissioning. If the first start-up is done by an
unprofessional person, damage to the boiler and the
heating system may occur.
Conditions for installation
The following conditions must be completed before the system is
released.
The installation of the boiler must be done according to the regulations - with
a minimum distance of 50 cm from the side, ie 40 cm from the back of the
boiler measured from the flue gas fan. Distance in front of the boiler must be
at least 100 cm.
Min. 40 cm
Min. 50 cm
Min. 50 cm
Min. 100 cm
Содержание EcoLogic 25
Страница 2: ...2...
Страница 22: ...22 Hydraulic conection diagrams...
Страница 23: ...23...
Страница 24: ...24...
Страница 25: ...25...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28...
Страница 34: ...34...
Страница 61: ...61 Clean the dust or dirt on the surface that sits on the seal of a heat exchanger box smaller box 1...