1
Site Preparation
What Happens Next?
Thermo Scientific
TSQ 8000 Evo Preinstallation Requirements Guide
17
What Happens Next?
and fill out the
TSQ 8000 Evo
Installation Request Form
. After the Installation Request Form is received, Customer Support
will contact you to schedule the installation of your system. It is important to confirm that all
the requirements on the form are met BEFORE the Field Service Engineer arrives.
The Field Service Engineer will install the system and confirm that all performance tests pass.