1
Site Preparation
Power Requirements
Thermo Scientific
TSQ 8000 Evo Preinstallation Requirements Guide
7
2. You may need a small, high-intensity lamp when you clean the TSQ 8000 Evo or work
inside the GC column oven.
Power Requirements
Use the following guidelines to ensure your site is equipped with enough power to support the
system. All circuits should be 50/60 Hz ± 2 Hz, single-phase with < 6% total harmonic
distortion.
• Circuit 1:
TSQ 8000 Evo MS plus the foreline pump and optional mech pump
.
100-240 Vac, 15 A
MAX
. The foreline pump and mech pump must be set to the line
voltage used at your location.
• Circuit 2:
GC
. 120 Vac +6/-10%, 16 A
MAX
or 230 Vac ±10%, 10 A
MAX
. Refer to
your customer sales order to determine if the GC is 120 Vac or 230 Vac. The GC
cannot be reconfigured in the field.
• Additional Circuits: Additional circuits are needed for the computer or other
equipment. 120 Vac +6/-10% or 230 Vac ±10%.
Note
Due to the power draw of the TSQ 8000 Evo MS and GC, each instrument must
be on its own dedicated circuit. These two circuits must be separate from the circuits used
for the computer and other equipment such as the autosampler.
Table 3.
System Power Requirements (Sheet 1 of 2)
Equipment
Circuits
Max Current
(A) at 120 Vac
(+ 6/- 10%)
Max Current
(A) at 230 Vac
(± 10%)
Maximum Power (W)
TSQ 8000 Evo MS
1
1
5.9
3.1
710
Foreline pump
2
N/A
4.6
2.7
550
Optional mech pump
2,3
N/A
4.6
2.7
550
TRACE 1300 and TRACE 1310
1
2
16
10
2000
Computer
4
Additional
(as needed)
5
2.6
600
Monitor
4
Additional
(as needed)
2
1
240
AI/AS 1310 Sampling systems
Additional
(as needed)
0.8
0.4
95
TriPlus RSH
5
Sampling system
Additional
(as needed)
3.2
1.7
200 with one power module
400 with two power modules
TriPlus 100 Liquid Sampler
Additional
(as needed)
–
–
200 with one power module
400 with two power modules