thermital TBPS  KOMPACT Series Скачать руководство пользователя страница 7

7

ENGLISH

GENERAL INFORMATION

GENERAL INFORMATION

EMPTYING IN 10’

TBPS KOMPACT

200

300

430

PERFORMANCE RELATING TO INTEGRATION COIL
Quantity of domestic water obtained in 10’ with heater pre-heated to 60°C (*) and primary exchanger at the indicated 

delivery temperature, considering an increase of the domestic water temperature of 30°C between inlet and outlet (ac-

cording to EN 12897).

Temperatura mandata serpentino superiore
80°C

166

260

330

l

70°C

138

255

323

l

60°C

131

250

308

l

PERFORMANCE RELATING TO SOLAR COIL
Quantity of domestic water obtained in 10’ with heater pre-heated to the indicated temperature (**) considering an in-

crease of the domestic water temperature of 30°C between inlet and outlet (according to EN 12897).

Temperature of accumulation tank lower part
70°C

374

438

659

l

60°C

284

375

531

l

50°C

205

310

390

l

DESCRIPTION

SOLAR STATION TECHNICAL DATA

Safety valve calibration pressure

6

bar

Maximum operating temperature

110

°C

Power supply

230~50

V-Hz

Min/max electrical current draw

0,08 ÷ 0,58

A

Min/Max power consumption

5 ÷ 63

W

Pressure drops
TOP COIL

PRESSURE DROP (mbar)

400

300

200

500

100

0

0

1000

2000

3000

4000

300

200

430

FLOW RATE (l/h)

Useful head available
BOTTOM COIL

USEFUL HEAD AVAILABLE (mbar)

700

650

600

0

400

200

300

500

100

700
650

550

450

500

600

400
350
300

0

400 600 800 1000

200

1200 1400

200

300

430

200

300

430

FLOW RATE (l/h)

Values referred to a mix of water and 30% glycol.

The circulator speed is controlled through PWM signal and var-

ies according to the thermal gradient between solar collectors 

and storage.

Pay attention to the system overall load losses (exchanger, so-

lar collectors and pipes) at the maximum foreseen flow rate 

conditions.

Содержание TBPS KOMPACT Series

Страница 1: ...TBPS KOMPACT INSTALLATION AND MAINTENANCE MANUAL...

Страница 2: ...EN 12897 ENGLISH CONTENTS The following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This m...

Страница 3: ...t immediately Keep the product purchase documents to be presented to the T authorised Technical Assistance Centre to request a service call under warranty b Size the solar expansion tank so as to ensu...

Страница 4: ...Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management control Manages 9 system diagrams that can be selected Re fer to the specific manual for further details IDEN...

Страница 5: ...t in non return valve 2 Delivery Valve solar plant delivery with built in non re turn valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirec...

Страница 6: ...1 33 W K Energy class B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 36 kW 400 572 890 l...

Страница 7: ...ccumulation tank lower part 70 C 374 438 659 l 60 C 284 375 531 l 50 C 205 310 390 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Страница 8: ...sions are recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maint...

Страница 9: ...y diameter length of magnesium anode 1 33 450 1 33 450 1 33 520 mm DF Flange internal diameter 130 130 130 mm A 1120 1420 1270 mm B 171 171 208 mm C 403 393 427 mm D M8 threaded inserts for grounding...

Страница 10: ...ve an omnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the prevail ing standards of the installation country respect the polarity of the L1 Phase N Neutral con necti...

Страница 11: ...robe cable together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any...

Страница 12: ...on valve VR counter clockwise Close taps A and B b During system flushing pay attention to water coming out of the taps as vapour could be released with risk of burns or scalds Use suitable personal p...

Страница 13: ...air bubbles have been eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Star...

Страница 14: ...d E Move away any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the...

Страница 15: ...supplied with the product End user TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C...

Страница 16: ...35017 Piombino Dese PD www thermital it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore l...

Отзывы: