INSTALLATION

INSTALLATION

1

2 3 4

5

0

6

F

Ps

Pa

Is

Ia

CN3
CN4

CN6

3

2

1

4 5 6

Psc

Psr

Ua

C

S1

Us

C

Cable duct (not supplied)

Sensor connections

- Route probe cables through the cable guides (F), the 

fairleads (Ps), the passages on the insulation (Is), the 

solar station outlets (Us/Ua) and connect them to termi-

nal board M4 of solar regulator (terminals S1-S2-S3-S4) 

making reference to the instructions provided in the 

specific regulator manual.

Upon connection, or should it be necessary to increase probe 

cable length, refer to these remarks:

- Absolutely avoid laying probe cable together with 

mains power cables and/or AC cables

- Absolutely avoid routing cables close to strong mag-

netic fields

- Avoid any cable jointing as much as possible; solder 

and duly insulate any indispensable jointing

- Use twisted and shielded wires

- Use cables having a cross-section of over 0.5 mm

2

Solar controller power connections

- Route the supply cable through the cable guides (F), 

the fairleads (Pa), the passages on the insulation (Ia), 

the solar station outlets (Ua) and connect it to terminal 

board M1 of solar regulator (terminals L-N-GND) mak-

ing reference to the instructions provided in the specific 

regulator manual.

Once electrical connections are completed, fasten cables us-

ing the guides supplied, close regulator cover and solar sta-

tion protection housing.

Содержание TBPS KOMPACT Series

Страница 1: ...TBPS KOMPACT INSTALLATION AND MAINTENANCE MANUAL...

Страница 2: ...EN 12897 ENGLISH CONTENTS The following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This m...

Страница 3: ...t immediately Keep the product purchase documents to be presented to the T authorised Technical Assistance Centre to request a service call under warranty b Size the solar expansion tank so as to ensu...

Страница 4: ...Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management control Manages 9 system diagrams that can be selected Re fer to the specific manual for further details IDEN...

Страница 5: ...t in non return valve 2 Delivery Valve solar plant delivery with built in non re turn valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirec...

Страница 6: ...1 33 W K Energy class B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 36 kW 400 572 890 l...

Страница 7: ...ccumulation tank lower part 70 C 374 438 659 l 60 C 284 375 531 l 50 C 205 310 390 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Страница 8: ...sions are recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maint...

Страница 9: ...y diameter length of magnesium anode 1 33 450 1 33 450 1 33 520 mm DF Flange internal diameter 130 130 130 mm A 1120 1420 1270 mm B 171 171 208 mm C 403 393 427 mm D M8 threaded inserts for grounding...

Страница 10: ...ve an omnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the prevail ing standards of the installation country respect the polarity of the L1 Phase N Neutral con necti...

Страница 11: ...robe cable together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any...

Страница 12: ...on valve VR counter clockwise Close taps A and B b During system flushing pay attention to water coming out of the taps as vapour could be released with risk of burns or scalds Use suitable personal p...

Страница 13: ...air bubbles have been eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Star...

Страница 14: ...d E Move away any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the...

Страница 15: ...supplied with the product End user TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C...

Страница 16: ...35017 Piombino Dese PD www thermital it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore l...

Отзывы: