thermital TBPS  KOMPACT Series Скачать руководство пользователя страница 12

12

ENGLISH

INSTALLATION

INSTALLATION

SYSTEM FLUSHING

Before filling the system with mixture of water and glycol, it is 

necessary to flush the pipes of the solar system to eliminate all 

residues of fluid or scale.

Proceed as follows.

- Turn handle on valve (VR) clockwise

- Open taps (A) and (B) on the return tube

- Flush water in through the cock (B) and wait for it to 

come out of the cock (A)

- Allow water to come out for at least 30 seconds

- Turn handle on valve (VR) counter clockwise

- Close taps (A) and (B).

During system flushing, pay attention to water coming 

out of the taps as vapour could be released with risk of 

burns or scalds. Use suitable personal protective equip-

ment.

VR

VM

B

90°

VR

90°

VM

Position of the knob of the

 

valves 

VM - VR

Flow in single 

direction 

(non-return valve 

function)

Flow 

stopped

A

If copper piping has been used and joints have been hot 

brazed, flush out the system to remove any brazing res-

idues. Seal test the system after you have flushed it out.

The solar circuit must be immediately filled with a mixture 

of water and glycol, that avoids freezing and corrosion.

Содержание TBPS KOMPACT Series

Страница 1: ...TBPS KOMPACT INSTALLATION AND MAINTENANCE MANUAL...

Страница 2: ...EN 12897 ENGLISH CONTENTS The following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This m...

Страница 3: ...t immediately Keep the product purchase documents to be presented to the T authorised Technical Assistance Centre to request a service call under warranty b Size the solar expansion tank so as to ensu...

Страница 4: ...Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management control Manages 9 system diagrams that can be selected Re fer to the specific manual for further details IDEN...

Страница 5: ...t in non return valve 2 Delivery Valve solar plant delivery with built in non re turn valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirec...

Страница 6: ...1 33 W K Energy class B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 36 kW 400 572 890 l...

Страница 7: ...ccumulation tank lower part 70 C 374 438 659 l 60 C 284 375 531 l 50 C 205 310 390 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Страница 8: ...sions are recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maint...

Страница 9: ...y diameter length of magnesium anode 1 33 450 1 33 450 1 33 520 mm DF Flange internal diameter 130 130 130 mm A 1120 1420 1270 mm B 171 171 208 mm C 403 393 427 mm D M8 threaded inserts for grounding...

Страница 10: ...ve an omnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the prevail ing standards of the installation country respect the polarity of the L1 Phase N Neutral con necti...

Страница 11: ...robe cable together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any...

Страница 12: ...on valve VR counter clockwise Close taps A and B b During system flushing pay attention to water coming out of the taps as vapour could be released with risk of burns or scalds Use suitable personal p...

Страница 13: ...air bubbles have been eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Star...

Страница 14: ...d E Move away any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the...

Страница 15: ...supplied with the product End user TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C...

Страница 16: ...35017 Piombino Dese PD www thermital it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore l...

Отзывы: