THERMITAL THE/TG 3S
steel boilers must be installed
in a dedicated boiler room, with adequately sized vents,
in compliance with applicable laws and standards.
If at all possible, the boiler should be installed on a
raised base to prevent the burner fan sucking up dust.
The gas supply pipe must be installed in such a way that
the boiler’s panelling can be removed and the front door
opened without having to remove the burner.
b
When installing the boiler, allow sufficient space
around it to access all safety and control devices
and to permit easy maintenance.
b
If the specific weight of the gas supply to the burn-
er is greater than the specific weight of air, install all
electrical parts at least 500 mm above floor level.
a
Do not install the boiler outdoors. It is not designed
to work outdoors and is not fitted with the neces-
sary automatic anti-frost systems to do so.
≥
1 m
A
B
≥
1 m
≥
L
≥
1 m
> 10 c
m
H
THE/TG 3S
90
115
166
217
255
349
448
511
639
850 1160 1450
A - Length
660
710
760
760
820
820
890
890 1000 1047 1147 1237 mm
B - Depth
1155 1330 1500 1500 1660 1960 2085 2085 2375 2657 2954 3173 mm
H - Heigjt
1175 1285 1390 1390 1524 1490 1685 1685 1820 1900 2080 2222 mm
20
ENGLISH
INSTALLER
PLACE OF INSTALLATION
Содержание 20034707
Страница 1: ...THE TG INSTALLATION OPERATION MAINTENANCE AND SYSTEM MANAGEMENT MANUAL...
Страница 39: ...39 ENGLISH GENERAL 39...