Form: 2435-3
Arctic Installation and Operation Manual
Revision: 10
P/N 105641-01
Date: 12-1-2018
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601
Web:
Phone:
717-239-7642
Fax:
877-501-5212
Email:
iv
Appendix E.1 Typical Horizontal Air Intake Piping ............................................................................................ 53
Appendix E.2 Typical Vertical Air Intake Piping .................................................................................................. 54
Appendix F Boiler Piping Diagrams – Typical Layout for all Boiler Models (Boilers may look
Appendix F.1 Single Boiler, Primary / Secondary ............................................................................................... 55
Appendix F.2 Multiple Boilers, Primary Reverse-Return Piping ................................................................... 56
Appendix F.3 Multiple Boilers, Primary / Secondary Reverse Return Piping ......................................... 57
Appendix F.4 Multiple Boilers, Primary / Secondary Piping .......................................................................... 58
Appendix F.5 Multiple Boilers, Primary / Secondary Piping, Heating with Domestic Hot Water ... 59
Appendix F.6 Multiple Boilers, Primary / Secondary Piping, Heating with Domestic Hot Water
Appendix G Water Flow Pressure Drops ..................................................................................................................... 61
Appendix H Wiring Diagrams ........................................................................................................................................... 63
Appendix H.1 ARC1000 Wiring Diagram ................................................................................................................ 63
Appendix H.2 ARC1500 To ARC3000 115 VAC Single Phase Wiring Diagram ........................................ 65
Appendix H.3 ARC1500 To ARC3000 208 – 230 VAC Single Phase Wiring Diagram ........................... 67
Appendix H.4 ARC2000 To ARC3000 208-460 VAC Three Phase Wiring Diagram .............................. 69
Tables
Table 1 Water Flow Switch Settings ............................................................................................................... 7
Table 2: Clearances and Serviceability .......................................................................................................... 11
Table 3: Typical Condensate Flow Rate ....................................................................................................... 12
Table 4: Combustion Air and Flue Gas Requirements .............................................................................. 19
Table 5: Electrical Requirements ................................................................................................................... 23
Table 6: Gas Supply Requirements ............................................................................................................... 24
Table 7 Sound Pressure Levels ...................................................................................................................... 24
Table 8 Minimum Water Flow Rates for Variable Primary Pumping ...................................................... 25
Table 9 Maximum Water Flow Rates for Variable Primary Pumping ..................................................... 25
Table 10 Water Flow Rates for Primary / Secondary Pumping 20F
Δ
T ................................................ 25
Table 11 Water Flow Rates for Primary / Secondary Pumping 40F
Δ
T ................................................ 26
Table 12: Water Flow Rates for Constant Volume Primary Pumping..................................................... 26
Table 13 GPM Increase for Glycol Systems ................................................................................................ 26
Table 14: Chemical Agents and Effects ........................................................................................................ 29
Table 15 Recommended Feed Water Limits ............................................................................................... 29
Table 16: Safety Device Test .......................................................................................................................... 34
Table 17: Safety and Operating Controls ..................................................................................................... 42
Table 18: General Troubleshooting .............................................................................................................. 43
Table 19: Maximum Gas Capacity Of Schedule 40 Pipe ........................................................................... 46
Table 20: Equivalent Lengths Of Standard Pipe Fittings And Valves ..................................................... 47
Table 21: Specific Gravity Correction Factors ............................................................................................ 47