Form: 2435-3
Arctic Installation and Operation Manual
Revision: 10
P/N 105641-01
Date: 12-1-2018
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601
Web:
Phone:
717-239-7642
Fax:
877-501-5212
Email:
iii
Water Flow Rates (Constant Volume Primary Pumping Systems) ................................ 26
3.6.1 Pre-Boil Out Flushing Of System ............................................................................................................................. 26
3.6.2 Boil Out Procedure ........................................................................................................................................................ 27
3.6.3 Replacement Boiler Installations ............................................................................................................................ 27
3.8.1 Purpose of water treatment ...................................................................................................................................... 28
3.8.2 Objectives .......................................................................................................................................................................... 29
3.8.3 Water softener ................................................................................................................................................................ 29
3.8.4 Continuous Monitoring ............................................................................................................................................... 29
Boiler Commissioning: This Section applies ONLY to the ARC1000 through ARC3000 ........ 31
4.10 Ignition Failure ........................................................................................
Error! Bookmark not defined.
Appendix A Sizing Gas Piping ........................................................................................................................................... 46
Appendix B Vent and Combustion Air Pressure Drop Data ................................................................................. 48
Appendix C Installation & Startup Report ................................................................................................................... 50
Appendix D Venting Diagrams ......................................................................................................................................... 51