Warning
Improper adjustments to the low fire
offset adjustment can lead to rough light-
offs and nuisance flame failures.
26.
Verify O2 repeatability by
commanding the boiler to high fire
and low fire as many times as
required, repeating steps 20 to 26 as
necessary.
Figure 7: High Fire Adjustment on the
Main Gas Valve Regulator
(
This valve applies
ONLY
to ARC1000 through ARC3000
)
27.
Once the boiler is operating within
the specified high and low fire
ranges, record emissions, flue draft,
and other important data on the
installation and startup report, see
Appendix C.
28.
Perform tests on each of the components
listed in
4.7
Finish Commissioning the Boiler:
This
Section applies
ONLY
to the ARC1000
through ARC3000
Reconnect any wires from the external control
system, if applicable.
1.
Perform an operation test of the external
control system.
2.
Place system control back in normal
operation, if necessary.
3.
Place the boiler into automatic mode.
Menu > Operation > Auto / Manual Rate
Control > Automatic (76 password
required)
4.8
Re-Starting After Prolonged
Shutdown
Use the following recommendations prior to
re-starting the heating system after prolonged
shutdown.
1.
Perform Pre-Start-Up Inspection by
checking all gas, water, air intake and
venting connections to ensure proper,
leak-free connections and that the water
and gas lines has been cleaned
completely.
2.
Ensure that combustion air piping, vent
piping, and terminations are free of
obstructions.
3.
Inspect the boiler for damage and loose
wire connections.
4.
Remove all flammable material present in
the vicinity of the boiler.