background image

7

Range

Remote

Blower

Green

Green

Black

Blue

Red

White

Molded Connector

White

White

Red

Red

Blue

Blue

Black

Black

BLOWER ELECTRICAL CONNECTION

The electrical connection of either the integral or remote
blower shall be made on the right front corner of the plenum
as shown in Figures 7 & 8.

Based on the type of ventilation (integral or remote blower)
proceed with directions either 1 or 2.

1.  Units using Integral Blower:

The integral blower is furnished with a cord and connector.
Insert cord connector into receptacle located in lower right
plenum bottom.  See Figure 7.

ELECTRICAL CONNECTION (ALL MODELS)

Figure 7 – Blower Cord Connection

OVEN  FRONT

Plenum Opening

Blower Cord

Receptacle

Integral Blower

Front Rail

2.  Units using Remote Blower:

a) Wiring the Remote Blower

Wire connections between the range
and remote blower shall be made as
follows:

1. Remove plenum cover and

front rail for access to range
blower wiring. (See Figure 8.)

2. Grasp the five wires and cut

as close to molded connector as
possible.

3. Remove plug from electric

"knockout" from plenum bottom
(right front corner).  Secure
remote blower flex conduit/wiring
to plenum conduit connector,

4. Connect color coded range

wires to remote blower wires
using wire nuts or approved splices.
(See Figure 9.)

5. Reinstall plenum cover and

front rail.

Figure 8 – Remote Blower Wiring

Figure 9 – Range - Remote Blower Electrical Connection

Range Front

Screws

Plenum Opening

Wiring

Compartment

To Remote

 Blower

Duct

Attachment Box

Removable

Plenum Cover

Removable

Front Rail

K.O.'s

Location

Содержание RDDS30V

Страница 1: ...GAZ Ne pas essayer d allumer aucun appareil Ne pas toucher aucun interrupteur lectrique ne pas utiliser aucun t l phone dans votre b timent Appeler imm diatement votre fournisseur de gaz du t l phone...

Страница 2: ...tion appropri e des gaz par le conduit de fum e chemin e des appaeils combustible pour viter le refoulement Suivre la directive des fabricants du mat riel chauffant et les normes de s curit tel que ce...

Страница 3: ...rface and the bottom of an unprotected wood or metal cabinet or 24 inches when bottom of wood or metal cabinet is protected by not less than 1 4 of flame retardant material covered with not less than...

Страница 4: ...ve the existing back brace see Figure 27 Page 18 and use floor mounted anti tip bracket see Figure 30 Page 19 NOTE Follow all measurements precisely If working with nonstandard cabinets take care to a...

Страница 5: ...au de 14 0 pounces du r gulateur du r servoir de gaz du propane WARNING Do not attempt any adjustment of the pressure regulator except conversion to propane AVERTISSEMENT Ne pas entreprener aucun ajus...

Страница 6: ...If local code requires separate ground separate white wire and bare gound wire connect white to white and ground bare wire separately GAS CONNECTION MODEL RDDS30V GAS CONNECTION For gas units a 1 2 N...

Страница 7: ...wer Cord Receptacle Integral Blower Front Rail 2 Units using Remote Blower a Wiring the Remote Blower Wire connections between the range and remote blower shall be made as follows 1 Remove plenum cove...

Страница 8: ...ust to roof angle Tape all joints to prevent air leaks NOTE The unit must be sealed between the roof or wall and the underside of the flange with roofing mastic to prevent leaks For installation on a...

Страница 9: ...ng See pages 10 to 12 for specific installation steps Threaded rods included in the blower kit will be secured to the mounting nuts A or B shown in Figure 15 Further installation instructions are spec...

Страница 10: ...nsure gasket between blower and plenum is compressed 1 Determine blower direction and cutout in cabinet as shown in Figs 16 17 Remove the existing 1 4 20 screws from either positions A or B and discar...

Страница 11: ...plenum outlet ring Figure 14 temporarily supporting blower with wood blocks 5 Place slot end of blower mounting bracket over rear mounting rod lower nut 6 Rotate blower mounting bracket under blower...

Страница 12: ...rod has one preset nut which shall be tightened against plenum 4 Place blower inlet over plenum outlet ring Figure 14 temporarily supporting blower with wood blocks 5 Place slot end of blower mounting...

Страница 13: ...to standard ducts See Figure 21 Exterior ducting may be routed right left rear up rear wall above and below floor line See Figure 22 VENTILATION Figure 21 Ducting Adapters Model RD7 Model RD310 REMOT...

Страница 14: ...will need to transition from other duct sizes to achieve the 10 diameter Be sure to use proper transitions from one size duct to another NOTE You need to calculate the equivalent lengths of straight d...

Страница 15: ...420 C F M BLOWER DUCT SIZING Based on the blower position determine the required straight duct length and size and the number and types of elbows or transitions Calculate the total equivalent length u...

Страница 16: ...16 BLOWER DUCT SIZING...

Страница 17: ...Cap Round to 3 1 4 x 10 Round to 3 1 4 x 10 90 Elbow 45 Elbow 3 1 4 x 10 to 10 Dia Model 310TR10 Equiv Length 1 Ft Fitting Straight Dia Length 6 5 Ft 7 4Ft 8 3 Ft Fitting Straight Dia Length 6 1 Ft 7...

Страница 18: ...shall allow the range back brace to slide under the anti tip bracket See Figure 26 c If necessary add spacer between bracket and wall to insure anti tip bracket engagement d Slide range into position...

Страница 19: ...LATION Figure 29 Placement of Anti tip Bracket to Floor TopView 12345678901 12345678901 12345678901 12345678901 12345678901 12345678901 12345678901 12345678901 12345678901 12345678901 12345678901 1234...

Страница 20: ...dor reserves the right to change specifications or design without notice Some models are certified for use in Canada Thermador is not responsible for products which are transported from the United Sta...

Отзывы: