11
■
1.
Determine blower direction. Blower may be rotated
as indicated in Figs. 18 and19 in order to miss wall studs.
Remove the existing 1/4 – 20 screws from either
positions “A” or “B” and discard them.
2.
Secure the rear mounting rod in either position
"A" or "B", as determined in Step 1. The rear mounting
rod has preset nuts on each end. Tighten nut against
plenum.
3.
Secure the front mounting rod in either position
"A" or "B" as determined in Step 1. The front mounting
rod has one preset nut which shall be tightened against
plenum.
VENTILATION
4.
Place blower inlet over plenum outlet ring (Figure
14), temporarily supporting blower with wood blocks.
5.
Place slot end of blower mounting bracket over
rear mounting rod lower nut.
6.
Rotate blower mounting bracket under blower for
support removing wood blocks as necessary.
7.
Place hole in blower mounting bracket over front
mounting rod and secure tightly with nut provided.
Insure gasket between blower and plenum is
compressed.
Figure 19 – Right Rear Venting, Integral
Blower (Bracket Position A)
Figure18 – Left Rear Venting, Integral Blower
(Bracket Position B)
INTEGRAL BLOWER - REAR DUCTING
A
B
A
B
Front
Floor
Rear Wall
Cabinet
31-1/2"
to
Counter
Top
1-1/8"
7-1/2"
Lc
of Cutout
➛
8"
1-1/8"
C
L
Cabinet
of Cutout
Rear Wall
31-1/2"
to
Counter
Top
Floor
B
B
A
A
Front
Mounting
Rod
Mounting
Rod
CL
Содержание RDDS30V
Страница 16: ...16 BLOWER DUCT SIZING...