PlanoSpot 360 DALI-2 S DE manual
12
6
Installation
6.1
Ceiling installation
Installation in false ceilings for ceiling thicknesses of 0.5 mm to 3 cm. The drill diameter for the
ceiling cut-out is 68 mm. Remove the contact protection (a) and connect the DALI cable with
plug-in terminal (b). Implement cable strain relief with cable tie, put on contact protection (c).
Open springs and mount detector in ceiling (d). Pay attention to window / interior alignment (e).
Remove installation protection (f). Align the detection area as required, by tilting the optics by
12° to the right (I) or left (II) (g). Snap on the bezel frame provided (h).