![Textron GSE 660-28 Скачать руководство пользователя страница 109](http://html1.mh-extra.com/html/textron-gse/660-28/660-28_operation-manual_1098142109.webp)
CD397-Oper
Operation - 4 - 3
August 2018 (Rev B)
Operation
Mobile Belt Loader Model 660-28
Section 4
Operation Manual
4.1.6
Conveyor
Belt
The 660-28 may be shipped as a single unit or the chassis and conveyor belt can be shipped separately.
When shipping or storing two or more conveyor units, space can be saved by removing and stacking the
conveyor belts. Perform the following steps for conveyor belt stacking:
1. Gather materials (Figure Operation-4-2 Conveyor Stacking Materials) for conveyor belt stacking:
•
three (3) tie down straps with padded ratchet (Tug Part # 660-4-3741).
•
three (3) rubber faced wooden supports
•
bubble wrap.
Figure
Operation-4-2:
Conveyor
Stacking
Materials
2. Ensure the conveyor is removed as outlined in the 660-28 Maintenance manual, Chapter 2, Sec-
tion 2.14 Conveyor Removal/Installation.
3. With the conveyor fully supported by the crane and resting horizontally, drive the “carrier” belt
loader under the hanging conveyor (Figure Operation-4-3 Placing the Carrier Conveyor).
Figure
Operation-4-3:
Placing
the
Carrier
Conveyor
Property
of
American
Airlines