background image

AMETEK CTS 

 

NSG 3040A, 3060A series 

Operating Manual 

V 1.04 

134 / 157 

 

16.1.1. 

Generator Network for Telecom Surge 

 
The figure below shows the elements and schematic of the Telecom surge pulse circuit 
 

 

 
 

T1 to T4

 

Ports for direct application 

 

HV, COM

 

Port to external coupling network 

 
All telecon output are served when using telecom surge application. Anyway, the coupling menu offers a coupling 
to the following options. This is more to confirm when using the remote software iec.control. 
 

-

 

HV 

– COM 

-

 

T1 + T2 + T3 + T4 

-

 

T1 + T2 

-

 

T3 + T4 

Содержание NSG 3000A Series

Страница 1: ...n for tests during development as well as for full compliant immunity tests and CE Marking for single phase DUT with the ability to be extended for testing three phase DUTs by means of an automaticall...

Страница 2: ...translation the accuracy cannot be guaranteed Approved AMETEK content is contained with English language version The present manual shows suggestions of test setups according the standards IEC 61000...

Страница 3: ...instructions 14 3 2 2 Scope of delivery 15 3 2 3 Accessories 16 3 2 4 Options 16 4 Installation put in service 17 4 1 Safety instructions for installation and initial installation 17 4 1 1 Qualificati...

Страница 4: ...8 2 2 Technical data surge module for NSG 3060A series 70 8 3 Pulsed magnetic Field as per IEC 61000 4 9 71 8 4 Power Fail Generator for DIPS interruption and voltage variation as per IEC 61000 4 11...

Страница 5: ...riation as per IEC 61000 4 11 112 14 1 Test setup for DIPS and Interruption tests 112 14 2 Operation 114 14 2 1 Quick Start 115 14 2 2 Standard Test Routines 116 14 2 3 User Test Routines 117 14 3 Vol...

Страница 6: ...17 4 Ring wave pulse application 148 17 5 Coupling decoupling network 148 17 5 1 Coupling to AC DC power supply lines 148 17 5 2 Coupling to I O lines 149 17 6 Test setup 150 18 Appendix 151 18 1 Decl...

Страница 7: ...els 300 V NSG 3040A IEC X X X NSG 3040A EFT CWS X X NSG 3040A EFT X NSG 3040A CWS X NSG 3040A DDV X Available Generators Burst Surge Power Fail Ring wave Telecom Surge Height HU NSG 3060A family 16 A...

Страница 8: ...erence effects for immunity testing according to international national and manufacturers standards The system is designed for full compliance conducted electromagnetic compatibility EMC test requirem...

Страница 9: ...s expense deliver the repaired or replaced product or parts to the buyer Any warranty of AMETEK CTS will not apply if the buyer is in default under the purchase order agreement or where the product or...

Страница 10: ...From December 2005 all AMETEK CTS products either hand soldered or by machine are produced using lead free solder 1 4 2 WEEE directive 2012 19 EU The AMETEK CTS NSG 3000A series generators is dedicate...

Страница 11: ...use the product if the power cable is damaged Ensure that a reliable return path for the interference current is provided between the equipment under test EUT and the generator The reference ground p...

Страница 12: ...y be floating above below chassis ground The design of external insulation must be such that it exceeds the maximum impulse voltages of the generator 4 8 kV or 6 6 kV Only qualified personnel who deal...

Страница 13: ...rsions and modifications The user is not entitled to the device to perform its own modifications and adaptations Modifying parts on the generator by unauthorized persons will void the warranty of the...

Страница 14: ...ackaging 3 3 Unpacking Is the packaging damaged If YES transportation company Are all the packages present and correct If NO transportation company Open the packaging remove the accessories Lift the N...

Страница 15: ...r Mains cable Power Mains cable Connectors country coded 3 ESC EUT Supply Cable Connectors country coded 4 ESA 1 EUT Supply Adapter Connectors country coded 5 STC 112801 Safety Circuit Terminator Sys...

Страница 16: ...000 Pulse Verification Fast 1000 Ohm PVF AD 1 Pulse Verification Fast Adapter 1 Multi Contact MC to SHV fix PVF AD1 PVF 50 or PVF 1000 CCI PVKIT 1 Industrial Capacitive Coupling Clamp Pulse Verificati...

Страница 17: ...y approved connectors and accessory items Ensure that a reliable return path for the interference current is provided between the EUT and the generator The ground reference plane and the ground connec...

Страница 18: ...tem GND The system is connected to GND via the earth wire of the connected mains power cable for the generator and the EUT supply A separate GND wire from the reference GND plane to the building earth...

Страница 19: ...cable into a power outlet with a solid ground connection 7 Switch the system on and operate as instructed in this manual 4 2 5 Connecting the NSG 3040A NSG 3060A system to the ground reference The ea...

Страница 20: ...al free contact open System is out of operation green closed System is operating red Voltage level 60 V max 2 A external powered IMPORTANT Important for operation Connect the delivered Safety Circuit...

Страница 21: ...ircuit open The device will switch off the high voltage and discharges the high voltage circuit 4 3 2 Warning Lamp The warning lamp offers a voltage free contact that indicates the status of the gener...

Страница 22: ...t breaker protection A circuit breaker is an electrical switch designed to protect an electrical circuit by overload or short circuit Its basic function is to detect a fault condition and interrupt cu...

Страница 23: ...gn of the external fuse must be matching the following rules fuse dimension must be equal or smaller than the rated EUT current of the connected test generator fuse must be designed for protect the co...

Страница 24: ...r settings NOTE If you have ordered the complete NSG 30x0 System from AMETEK CTS the System configuration was completed in the AMETEK CTS factory in Switzerland 4 5 1 Power ON the NSG 30x0A generator...

Страница 25: ...L N PE 3 Phase to L1 L2 L3 N PE The output path for 1 ph EUT can be selected in the test menu by the user Supply AC Coupling 1 ph set to L N PE 3 phases to L1 L2 L3 N PE Path PF1 Vnom 230 V 115 V Limi...

Страница 26: ...DN 1 phase External Pulse output at the CDN 3000A CDN 1 phase 3 phase Select output path for the impulses 1 Select Cpl To select the coupling path for other phenomenon like EFT Burst pulsed magnetic f...

Страница 27: ...e transformer VAR 3005A S16A 4 Press ADD for close and exit NOTE See separate chapter for adjust the variable transformer parameters External couplers External 3 phase coupling to NSG 3000A series dev...

Страница 28: ...ES MODULES 3 Make a long click to NSG 3040A or click NSG 3040A and press change The yellow field indicates the information for Serial number Software number This number is matched with the license cod...

Страница 29: ...3 6 2 SysOS update This update overwrites the settings to the factory setting A previous Backup with Export Settings is strongly recommended C 3 6 3 Export actual settings D 3 6 4 Import settings F 3...

Страница 30: ...nter will indicate that the device will reboot after 10 seconds System reboot 6 If you get the following message after rebooting a Click OK b Continue with step 7 to 12 for the Phenomenon Firmware upd...

Страница 31: ...install 9 The available firmware updates are installed automatically on the NSG 3000A generator The update processing is indicated and may need several minutes to complete 10 After successfully updat...

Страница 32: ...EUT settings All settings in SETUP GENERAL All settings in SETUP EQUIPMENTS All Link tests User tests Customized Standards Make sure that you have done the Chapter 4 6 3 Export actual settings Softwar...

Страница 33: ...O NOT REMOVE the USB Stick from the device and Switch OFF the NSG 3000A wait 5 seconds and switch it ON again 7 A few seconds after restarting the device you should see the following screen Please wai...

Страница 34: ...vice settings on an external USB Stick It is strongly recommended to export the settings before doing a SysOS update Export settings procedure 1 Select MENU SETUP 2 Press System 3 Insert USB Stick to...

Страница 35: ...want save the backup setting files for export Press SELECT for export the backup data 6 A message indicates the backup writing to the USB stick A message on the bottom of the screen confirms that the...

Страница 36: ...s restores all device settings from an external USB Stick It will reinstall all device settings after a SysOS update 1 Select MENU SETUP 2 Press Update Software 3 Insert USB Stick to the back USB slot...

Страница 37: ...s Operating Manual V 1 04 37 157 5 Press BACK 6 Select the backup file syssettings bkp and click SELECT 7 Remove all USB Sticks and Restart the NSG 3000A the initialization process will start normally...

Страница 38: ...re in the root A message for searching the memory stick appears until the memory stick is recognized Firmware filename upt 3 Make a long click to NSG 3000A or a click to NSG 3000A press change 4 Press...

Страница 39: ...update process is shown on the screen and needs several minutes Press CANCEL to exit Exclude Downgrades will not install older versions when detected on the USB stick 6 After display Update successfu...

Страница 40: ...o zero to nearest range 4 Test On After pressing the Test On key the following actions are activated Activate the high voltage power unit HV is ready to start Switches ON the supply to the EUT test su...

Страница 41: ...ation the burst repetition rate and the spike frequency 5 V rectangular This output can be generally used as oscilloscope trigger output and is synchronous to the following events Burst and surge rele...

Страница 42: ...he surge generator is located at the rear panel of the generator It is not allowed to connect these outputs to any other coupling decoupling network than manufactured by AMETEK CTS Before to connect a...

Страница 43: ...purpose ONLY USB interface USB B connector for service purpose with an external computer Using the USB interface may cause EMC problems during burst tests at the computer or notebook side of the comm...

Страница 44: ...t digit This will rotate the digits cyclic 1 10 100 1000 1 10 A small value indicates the selected digit that will be controlled by the wheel Long press wheel All digits right will be replaced by a ze...

Страница 45: ...efaults Run Window The run window is active from the Start of the test until the user press the Back or button after a stop or when the test is finished It is possible to return into the Run window wi...

Страница 46: ...the user can PAUSE and START Resume or STOP the test red circles Testing Test is running Break Test is paused and can be continued with start Resume Test is running and continued after a break Stop T...

Страница 47: ...oom view Enables disables the zoom view Zoom parameter configuration Configuration Trigger and Monitor configuration Change display parameter 1 Click the parameter you like to change A field with all...

Страница 48: ...of auxiliary test equipment Information Device name Software and firmware version address of representatives 6 1 Test phenomenon Menu to start a test Touch into a field of the NSG 3040A or NSG 3060A...

Страница 49: ...onfiguration and Setup for the test The generator uses the settings and offers exact the needed information for the EUT All needless information will not be displayed Setup 6 6 Setup Setup General set...

Страница 50: ...as visible or hide Standards User Remove test from the library User 6 4 Information Information System Information Device Version Firmware Software Representative address AMETEK CTS offices when wipe...

Страница 51: ...ge Advantages are Select only set the possible couplings and hides all unnecessary settings for the user Filters the standard tests adapted to the EUT like AC 50Hz AC 60 Hz DC Set the VAR 3005A S16 to...

Страница 52: ...Star with PE L1 L2 L3 N Star no PE PEN L1 L2 L3 PE Delta with PE L1 L2 L3 Delta np PE L1 L2 PE Interphase Lx Lx other combination Supply DC Coupling Power Lines Plus Minus PE with PE Plus Minus no PE...

Страница 53: ...rent voltage than the actual mains voltage For power fail tests only PF2 mode with voltage interrupt tests are possible Internal hardware current limiter The built in internal hardware limiter operate...

Страница 54: ...gger Power frequency detection HV COM 18 F capacitor Display Brightness Sounds Loudspeaker volume Sounds Test running Test finish enable disable Signals Surge countdown Waiting for trigger warning sig...

Страница 55: ...dd mm yyy dd mm yyyy dd mm yyyy yyyy mm dd Set time Hour minute Time format hh mm ss 24 h hh mm ss 12 h 6 6 3 Setup Signals menu Surge Ring Wave countdown signal One beep 2 seconds before surge trigge...

Страница 56: ...Display Brightness level Move the cursor to change Timer Dims the backlighting after the preset time if no touch is carried Setting 1 2 10 20 minutes 1 hour never 6 6 5 Setup Remote Individual settin...

Страница 57: ...d When using an AMETEK CTS coupling device with Sys Link connection the capacitor is automatically disabled The recognized connected AMETEK CTS 3 phase CDN has already a built in 18 F capacitor When u...

Страница 58: ...NSG 3040A generator 2 Long press or click CHANGE Will open the device module module information Long press to NSG 3040A Device name Serial number Software number Firmware version Calibration date last...

Страница 59: ...A C32 NSG 3060A CDN 3063A C32 CDN 3063A C63 CDN 3063A C100 PS Other CDN can be connected with HV COM Coil for magnetic field Actual device replaced device MFC 30 1 turn pulse power power with MFG 40 1...

Страница 60: ...orized variac transformer Tapped Tapped transformer H Field Magnetic field current transformer Default transformer Library that can selected by ADD Variable Transformer Var 3005A S16A Tapped Transform...

Страница 61: ...adjust the external voltage variable transformer to the NSG 3000A The voltage setting is a regulating procedure where one winding of the VAR 3005A S16 is approx 1 9 V Additionally the control needs s...

Страница 62: ...he adjustment procedure has the following structure 2 Press ADJUSTMENT for start the adjustment procedure Initialize the adjustment wizard For prepare Press TEST ON if not activated Connect variable t...

Страница 63: ...rease the value for higher voltage increase the value for lower output 12 Press NEXT to continue Check at Vnom 0 V level at zero position Settled nominal voltage Vnom 0 V Output 0 10 V voltage 0 V to...

Страница 64: ...al screen of max voltage adjustment Settled nominal voltage Vnom 230 V Output 0 10 V voltage 230 V Max voltage 10 00 V 19 OK Write the max Voltage value into the parameter list and exit wizard Previou...

Страница 65: ...Position ref dc voltage 80 8 00 V 0 35V 70 7 00 V 0 35V 40 4 00 V 0 35V Example for automatic tapped transformer TVT 1 250 16 1 1 Make a click Long click into the device or press CHANGE button for cha...

Страница 66: ...ontrollers 3 HMI board touch panel 4 Power supply 5 Mains filter High voltage unit 6 High voltage power supply 7 Energy storage capacitors Pulse forming 8 Measuring Unit 9 Surge pulse forming unit 10...

Страница 67: ...ltage power supply 7a Energy storage capacitor Surge 7b Energy storage capacitor Ring wave 8 not used 9 Surge pulse forming unit 10 Ring wave pulse forming unit 11 Surge pulse measuring transformer 12...

Страница 68: ...egative alternate Trigger Trigger of bursts AUTO MANUAL Synchronization 0 360 10 300 VAC 15 500 Hz Burst duration td 0 10 ms 9999 ms Burst period rate tr 15 ms 9999 ms Spike repetition frequency f 100...

Страница 69: ...Pulse duration 20 s 20 25 s 30 Polarity Pol Pos Neg Alt Repetition pulse tr 10 s 9999 s Number of cycles n 1 99 999 Counter 1 1 000 000 Trigger Trigger of pulses AUTO MAN Phase Angle synchronization A...

Страница 70: ...os Neg Alt Repetition pulse tr 10 s 9999 s Number of cycles n 1 99 999 Counter 1 1 000 000 Trigger Trigger of pulses AUTO MAN Phase Angle synchronization A 0 360 10 300 VAC 15 500 Hz Resolution 1 Trig...

Страница 71: ...connector Zi 2 x x Coupling network L N with Z 2 not preferred x Settings Impedance factor V A 0 01 to 100 setting range typical 0 45 with INA 702 Coil factor setting m 1 0 01 to 100 setting range Typ...

Страница 72: ...l current continuous max current channel PF2 nominal current continuous Trigger Events trigger AUTO MAN Reduced time td 0 01 ms 9 999 ms Accuracy 0 05 1 9999 s 0 5 9999 cycles Repetition tr 10 ms 9 99...

Страница 73: ...on Magnetic field tests per IEC 61000 4 8 and 9 The test routines for handling the magnetic field tests are included in the internal NSG firmware All functions to control external options as voltage c...

Страница 74: ...rnate Trigger Trigger of pulses AUTO MAN Phase angle synchronization A 0 360 resolution 1 Repetition tr 10 s 9999 s Number of cycles event n 1 99 999 selectable Outputs Direct Via HC COM safety lab co...

Страница 75: ...10 700 s Open circuit output voltage V 200 V 6 600 V 10 Rise time tr 10 s 30 Pulse duration td 700 s 20 Short circuit output current 5 165 A Rise time tr 5 s 20 Pulse duration td 320 s 20 Coupling As...

Страница 76: ...r service purpose only 1x opto link user remote interface convert to USB port on computer Baud rate 9 600 Bd LAN Ethernet user remote interface SYS link IN OUT 26 pin high density Sub D to control ext...

Страница 77: ...housing including the touch panel If necessary add a small amount of a mild non foaming household cleanser No chemicals acid etc should be used for cleaning purposes Before beginning to clean the tes...

Страница 78: ...ch this issue as follows AMETEK CTS make use of a solid state semiconductor switch technique to generate high voltage transients A precious advantage of this technique is the absolute lack of periodic...

Страница 79: ...rge voltages than 4000V a sparkover at the power mains socket may occur Customers shall be aware of this matter and shall not use higher voltages than labeled on the adapter For testing higher voltage...

Страница 80: ...r Burst and Surge CDN 30X3 coupling network EUT AC mains 3 x 480 V rms max EUT DC supply see derating in CDN manual Nominal current Inom 32A 63A 100 A rms DC Frequency 50 60 Hz Coupling to all lines N...

Страница 81: ...or over the discharge resistor immediately After the START the test will continue with the correct voltage level 11 1 Operation Click into Burst menu loads the last used menu Of the following routines...

Страница 82: ...er of sequences as STEP tests The STEP tests are stored until the device is switched off CONFIGURATION Configuration of the trigger monitor and standard change activate inactive settings SAVE AS USER...

Страница 83: ...gs are stored automatically and will be recalled when Quick Start is selected Quick Start Menu Devices NSG 3040A Quick Start testing Burst specification as per IEC 61000 4 4 Ed3 2012 f 5kHz td 15ms tr...

Страница 84: ...his test routine all standard parameters can be changed online during testing For change tip to the black marked parameters The user can easy select the following parameters T test duration 1 s to 999...

Страница 85: ...ng Manual V 1 04 85 157 11 1 4 User Test Routines The user can program save and recall his own specific user test routines created by himself The user test routines library offers various useful self...

Страница 86: ...e routines are deleted If more than one STEP routine is in the library the Program will run one sequence after the other and will stop when the last STEP sequence has finished In our case the test sta...

Страница 87: ...voltage Iteration tests the parameters changes after each step cycle as shown in the figure below Example with voltage iteration that illustrate trigger out for cycle and step 11 2 1 1 Signal Trigger...

Страница 88: ...ontrol for the report generation Stop The test will immediately stop and is finished Pause The test breaks and can be continued with START PAUSE EUT Monitor input signal EUT Monitor Input BNC plug on...

Страница 89: ...ally possible for the high voltage switch Therefore the following limitation protects the pulse forming circuit against overload Burst impulses s Voltage V Max pulses s continuous burst 1 880V 8 500 2...

Страница 90: ...mum output voltage The efficiency of the burst pulses decreases with the numbers of couplings Therefore the maximum test voltage is limited depending on the number of tested lines Coupling NSG 3040A N...

Страница 91: ...on both sides of the coupling clamp Coupling method Test duration At least 1 minute in positive and negative polarity The test duration must be at least as long for examine all functions of the EUT C...

Страница 92: ...l connected cables The EUT should only be grounded if this is recommended by the installation guideline For safety reasons the test without any ground connection should be conducted as well at 100 MHz...

Страница 93: ...beneath the coupling clamp and beneath the EUT shall be at least 0 5 m Coupling via 50 Ohm output generator Coupling via 50 Ohm output 3 ph CDN The distance between any coupling devices and the EUT s...

Страница 94: ...400 Hz application 12 1 Operation The surge menu offers different test routines for surge testing Click into surge menu loads the last used menu Of the following routines below Quick Start Easy and fa...

Страница 95: ...nctions of the equipment The latest simulator settings are stored automatically and will be recalled when Quick Start is selected Quick Start Menu Quick Start testing 12 1 1 1 Voltage and phase angle...

Страница 96: ...PE HV COM external for data lines 12 1 2 1 Surge Standard library The surge Standard menu offers a list of standards The name of the standard defines the characteristic of the rulers that is given in...

Страница 97: ...n List of settings EN 61000 6 1 each setting with 5 pulses Setting Voltage Coupling Polarity Phase angle Setting Voltage Coupling Polarity Phase angle 1 2 3 4 500 L N pos 0 90 180 270 33 34 35 36 1000...

Страница 98: ...ser Test Routines The user can program save and recall his own specific user test routines created by himself The extended menu offers various useful tests for testing and development SAVE AS USER TES...

Страница 99: ...one STEP routine is in the library the Program will run one sequence after the other and will stop when the last STEP sequence has finished In our case the test starts with STEP B and continue with S...

Страница 100: ...be selected The same parameters as under Quick Start can be selected ANSI B coupling after n pulses The coupling mode with 2 und 18 F will automatically be changed after the preselected number of pul...

Страница 101: ...ator front side Signal trigger for the impulse or event when Start button is blinking Behavior of the EUT Monitor 1 on BNC plug on rear side 12 2 1 1 Iterations For Iteration tests the parameters chan...

Страница 102: ...ble 5V edge signal located at the front side BNC Trigger plug This signal is for trigger other devices like oscilloscopes or other devices 12 2 1 4 EUT Monitor Behavior of the EUT Monitor 1 BNC plug a...

Страница 103: ...at the HV COM output Application with 18 F capacitor Pulsed magnetic field application to a single turn antenna as per IEC 61000 4 9 Generator pulse verification at the NSG 3000A HV COM output Pulse v...

Страница 104: ...se of too high phase shifting the user can connect a proper sync signal to the SYNC IN plugs at the rear side of the compact NSG generator The table below illustrates the correction angels considering...

Страница 105: ...Attention The decoupling part of the coupling decoupling network includes some capacitors for filtering of 20 F related tp protective Earth chassis of the generator This is to be conform to the requir...

Страница 106: ...es Danger Using coupling networks CDN series Switch OFF the high voltage during manual change of the coupling 12 6 Test setup According to the specifications of IEC 61000 4 5 the surge generator has a...

Страница 107: ...Caution Only coils with 1 turn can be used for pulsed magnetic field application 13 1 Pulsed Magnetic field operation The menu offers different test routines for pulsed magnetic field testing Main men...

Страница 108: ...factor within the setup menu under the service routine Setup pulsed magnetic test field The following coils can be used Ok not Ok MFC 1000 1 turn MFC 1000 1 1 turn MFC 30 1 turn pulsed 11 turns power...

Страница 109: ...109 157 13 1 1 Quick Start Easy and very fast operation of all standard functions of the equipment The latest simulator settings are stored automatically and will be recalled when Quick Start is next...

Страница 110: ...sy select the following parameters T test duration 1 s to 999 s standard says 60 s or faster depend on the protection devices power rate Level voltage Level 3 100 A m Level 4 300 A m Level 5 1000 A m...

Страница 111: ...ser Test Routines The user can program save and recall his own specific user test routines created by himself The extended menu offers various useful tests for testing and development SAVE AS USER TES...

Страница 112: ...ruption tests Voltage DIPS For voltage DIPS a connection must be made from the NSG 3000A PF2 input to the variable transformer PF2 or tapped transformer where the reduced voltage is present Interrupti...

Страница 113: ...tup for PF1 mode The generator is connected as follow PF1 Mains voltage from the grid PF2 Switch is open during the test The generator switch will PF1 for interrupt the supply voltage to the EUT Setup...

Страница 114: ...d power interruption tests Standard The operator can select between various preprogrammed test routines as required in different standards The operator can select the standard routine for 50 60Hz depe...

Страница 115: ...ion to mains On Off The parameter to change can be selected by pressing a function key The corresponding range will then be displayed 14 2 1 1 Voltage DIPS For testing voltage DIPS select Mode U Durin...

Страница 116: ...e test is conducted automatically If this option is not available the manual test routine shall be used Using a manual tapped transformer TVT 1 250 16 the user must connect the PF2 input with the corr...

Страница 117: ...ed by himself The user test routines library offers various useful self created tests for testing and development The user can program save and recall his own specific user test routines created by hi...

Страница 118: ...es Operating Manual V 1 04 118 157 14 3 Voltage Variation Main Menu Power Fail for voltage dips and interrupt tests and voltage variation Attention The voltage variation menu requires a motorized vari...

Страница 119: ...y In the operating mode AUTO the events are released at a preselected interval time Power switches The power unit of the simulator consists of two electronic power switches S1 and S2 The two separated...

Страница 120: ...F2 Over voltage generated by connecting or disconnecting additional loads will be limited internally by varistors in parallel to the electronic switch Occurs an overcurrent during a test The PF switch...

Страница 121: ...voltage drop over the internal PFS switch is shown in the diagram below current A voltage drop V 0 01 1 18 0 1 1 62 0 5 2 43 1 2 60 2 2 75 3 2 82 4 2 90 5 2 97 6 3 05 7 3 12 8 3 18 9 3 25 10 3 30 11 3...

Страница 122: ...ns power supply or from a separate voltage source Mostly used for these tests are motor driven variable transformers Power fail tests are normally carried out at a nominal voltage and at maximum toler...

Страница 123: ...connected at the rear side of the simulator PF1 Nominal voltage PF2 Under overvoltage The operation mode U shall be preselected The voltage variation is realized by switching the power supply from ch...

Страница 124: ...wire to the NSG 3000A N EUT output plug on front side Prepare the L wire to connect it after test start to the L EUT output plug in a short time B Test procedure Press start button The white LED chan...

Страница 125: ...following devices NSG 3040A NSG 3060A series 14 9 1 2 Device models TVT 1 250 16 series TVT 1 250 16 250 V 16 A manual control TVT 1 250 16 1 250 V 16 A automatic control 14 9 1 3 Control TVT 1 250 16...

Страница 126: ...250 16 TVT 1 250 16 1 Current Imax 16 A 16 A Power 4 1 kVA 4 1 kVA Fuse 2x 16 AM 2x 16 AM Tap setting manual Automatic 0 10 VDC Weights and measures Dimensions 95 x 170 x 190 mm H x B x T 95 x 170 x 1...

Страница 127: ...ent For connection safety labor cables shall be used 14 9 2 2 Voltage variation Additionally it is possible to drive certain functions of variation which also are required in IEC 61000 4 11 These func...

Страница 128: ...able Vout 0 260 V for channel PF2 Voltage fix Vout Vin for channel PF1 Current max 16 A Power 0 4 1 kVA Control Main switch On Off for the output voltages Control voltage analogue 0 10V DC for 0 260V...

Страница 129: ...rge In this menu the user can operate all surge test manually with online change the most parameters during a test Standard The operator can select between various preprogrammed test routines as requi...

Страница 130: ...The MFT 30 has two ranges and therefore the NSG generator list this current transformer in the configuration for 3 A and 30 A range Set the range switch of the MFT 30 to the correct position before st...

Страница 131: ...1 m loop antenna with one turn For the standard antenna the standard defines a current of 1 145A for a magnetic field of 1 m 1 The variable transformer VAR 3005A S16 will be controlled automatically v...

Страница 132: ...ic field antenna MFC 1000 x External current transformer MFT 100 to test 100 A m continuous and up to 1 000 A m short term Tests with 1 000 A m magnetic field During tests with a field of 1 000 A m th...

Страница 133: ...th online change the most parameters during a test Standard The operator can select between various preprogrammed test routines as required in different standards The standard library includes IEC ITU...

Страница 134: ...matic of the Telecom surge pulse circuit T1 to T4 Ports for direct application HV COM Port to external coupling network All telecon output are served when using telecom surge application Anyway the co...

Страница 135: ...tions of the equipment The latest simulator settings are stored automatically and will be recalled when Quick Start is next selected Quick Start Menu Quick Start testing Coupling setting The generator...

Страница 136: ...he rulers that is given in the application of the standard The standard name has the character Standard Family Standard number year Application where Standard Family IEC International Electrotechnical...

Страница 137: ...han one STEP routine is in the library the Program will run one sequence after the other and will stop when the last STEP sequence has finished In our case the test starts with STEP B and continue wit...

Страница 138: ...ug This signal is for trigger other devices like oscilloscopes or other devices If the start trigger is not set to Automatic the trigger indicates with Waiting for trigger the recommended trigger sign...

Страница 139: ...st used menu Of the following routines below Quick Start Easy and fast online operation with the phenomenon ring wave In this menu the user can operate all ring wave test manually with online change t...

Страница 140: ...red automatically and will be recalled when Quick Start is next selected Quick Start Menu Quick Start testing While a test runs the user can select parameters The selected parameter then can be change...

Страница 141: ...0 V 2000 V Level 4 500 V to 4000 V 4000 V Coupling Cpl IEC L N PE HV COM external for data lines The standard name has the character Standard Family Standard number year Application where Standard Fam...

Страница 142: ...of settings EN 61000 4 12 each setting with 5 pulses Setting Voltage Coupling Polarity Phase angle Setting Voltage Coupling Polarity Phase angle 1 2 3 4 500 L N pos 0 90 180 270 33 34 35 36 1000 L PE...

Страница 143: ...V 1 04 143 157 17 1 3 User Test Routines The user can program save and recall his own specific test routines The next pages show the selection of the functions SAVE AS USER TEST Save the actual test...

Страница 144: ...l these routines are deleted If more than one STEP routine is in the library the Program will run one sequence after the other and will stop when the last STEP sequence has finished In our case the te...

Страница 145: ...or front side Signal trigger for the impulse or event when Start button is blinking Behavior of the EUT Monitor 1 on BNC plug on rear side 17 2 1 1 Iteration For Iteration tests the parameters changes...

Страница 146: ...out Each step same as trigger out 17 2 1 3 EUT Monitor Behavior of the EUT Monitor 1 BNC plug at the rear side Disabled No function Notify Send a notify signal to iec control for the report generatio...

Страница 147: ...the generator calculates the correct phase angle for phase triggering The tables below illustrate the correction angels considering the phase in a 3 phase system with synchronization signal from L1 N...

Страница 148: ...k includes some capacitors for filtering related tp protective Earth chassis of the generator This is to be conform to the requirement of IEC 61000 4 12 concerning attenuation of the surge transients...

Страница 149: ...may be disturbed For coupling to I O lines special couplers according the Standard IEC 61000 4 12 are available such as the CDN117A C6 4 1 and CDN118A C6 4 1 series Example Coupling to unbalanced uns...

Страница 150: ...61000 4 12 the Ring wave generator has a source impedance of Generator impedance 12 for a c d c power ports and shielded interconnection lines 30 for interconnection lines 50 as per UL 943 Impedance...

Страница 151: ...al equipment for measurement control and laboratory use Requirements for devices to use in industrial area EN 61000 3 2 2014 Limits for harmonic current emissions EN 61000 3 3 2013 Limitation of volta...

Страница 152: ...ctrical equipment for measurement control and laboratory use Requirements for devices to use in industrial area EN 61000 3 2 2014 Limits for harmonic current emissions EN 61000 3 3 2013 Limitation of...

Страница 153: ...tage Directive 2014 35 EU Standard to which conformity is declared EN 61010 1 2011 Safety requirements for electrical equipment for measurement control and laboratory use EMC Directive 2014 30 EU Stan...

Страница 154: ...oltage Directive 2014 35 EU Standard to which conformity is declared EN 61010 1 2011 Safety requirements for electrical equipment for measurement control and laboratory use EMC Directive 2014 30 EU St...

Страница 155: ...s to which conformity is declared EN 61326 1 2013 Electrical equipment for measurement control and laboratory use Requirements for devices to use in industrial area The purpose of this device is to co...

Страница 156: ...AMETEK CTS NSG 3040A 3060A series Operating Manual V 1 04 156 157 18 2 NSG 3040A series General Block Diagram...

Страница 157: ...AMETEK CTS NSG 3040A 3060A series Operating Manual V 1 01 157 157 18 3 NSG 3060A series General Diagram...