ATTENTION!
Water
heating
system
installation
should
only
be
performed
by
qualified
personnel
from
a
specialized
construction
organization.
ATTENTION! At the time of pipelines installation, don't permit its sagging in horizontal segments. It is
recommended to install these pipelines at an angle of up no less than 30°.
ATTENTION! Don't use pipes with work temperature of operation less than +95°C for a water heating
system.
ATTENTION! Don't use connecting elements of a pipe fitting with nominal width less than nominal width
of fitting adapter of a heat exchange unit.
ÂÍÈÌÀÍÈÅ! Çàïðåùàåòñÿ ýêñïëóàòèðîâàòü ñèñòåìó âîäîíàãðåâà ïîä èçáûòî÷íûì äàâëåíèåì,
îòëè÷íûì îò àòìîñôåðíîãî.
ATTENTION! Pressure test of the system by higher pressure shall be carried out when the heat exchange
unit is switched off.
ATTENTION! Only clear water shall be filled to a water heating system. It shall meet requirements of
quality in the context of salt, iron, lime content and other.
It is necessary to compact thread connections by plumbing sealant or PTFE-4 band GOST24222-80 (GOST –
national state standard).
ATTENTION! Hot water tank is the unit of extra high hazard that is why it is necessary to exercise caution
while being near it.
ATTENTION! «Termofor» company is not responsible for improper fastening of the tank.
ATTENTION! Avoid corrosive substances entering the hot water tank and water heating system.
ATTENTION! It is prohibited to pour water into the empty tank and (or) fill in empty water heating system
(if any) after stove starting up until the full cooling off of the stove and the tank.
An external hot water tank can be used with the stove
«
Battery-Fire
».
The external tank is attached to the wall of a room in a user-friendly place
and connected to the
heat
exchanger
tank
with the piping (water heating system
installation, see 7.6).
The water in the tank is heated
circulating through the heat exchanger.
7.7. Hot water tank assembly
1 - Flue
2 -
«
Battery-Fire
» stove
3
–
Internal heat exchanger tank
4 - Venting
5
–
External hot water tank
6
–
Hot water distributing valve
7
–
Communication pipes
8
–
Water draining tap
min 30°
m
in
5
0
ì
ì
5
6
7
3
1
2
8
4
Figure
15.
General scheme of water heating system installation
Содержание Battery Fire 11
Страница 1: ...Battery Fire USER MANUAL ...