July 2021
Service and Repair Manual
Platform Components
Part No. 1299608GT
S
®
-60 DC • S
®
-60 FE
27
5 Activate and hold primary boom up for 3 -
4 seconds.
Result: Hour meter displays
MAXRATED
LOAD CAL OK
. Calibration is saved.
Result: Hour meter displays
MAXRATED
LOAD OUT OF RANGE
. Calibration has not
been saved. Adjust the load cell and repeat
this procedure.
6 Push in the red Emergency Stop button to the
off position.
Confirm calibration:
7 Start the engine from the ground controls.
8 Add an additional 50 lbs / 23 kg of weight or
load to the platform.
Result: The alarm sounds. The engine turns
off. The platform overload indicator light
flashes at the platform controls and
Platform
Overload
is displayed on the LCD screen at
the ground controls.
Note: There may be a 2 second delay before the
overload indicator lights flash and the alarm
sounds.
9 Test all machine functions from the ground
controls.
Result: Engine does not start. Limited APU
functionality. Elevate and extend functions do
not operate.
10 Remove the weight or rated load from the
platform.
Note:
For CE
and
AS models
, reset the overload
recovery message. Refer to Repair Procedure,
How to Reset Overload Recovery Faults.
How to Replace the Platform Overload Load Cell
How to Replace the Load Cell
Sensor
Note: The preload adjustment should only be
performed after the load cell sensor has been
replaced.
1 Remove all equipment or tools from the
platform. Remove the welder if equipped.
2 At the platform, remove the plastic instruction
holder from the document mount plate.
3 Tag and disconnect the load cell sensor
harness.
4 Loosen the jam nut securing the load cell
sensor foot and rotate the foot screw
clockwise to remove the preload.
5 Remove the fasteners securing the load cell
sensor and remove the sensor.
Install the new Load Cell Sensor
6 Screw the foot with jam nut into the top of the
load cell sensor until the foot bolt extends out
of the bottom of the sensor.The foot should
not contact the flex plate when assembling
onto the platform support.
7 Assemble the load cell and foot assembly to
the platform and securely tighten the two
mounting screws. Torque the bolts to 101 ft-
lbs / 137 Nm.
Set the Load Cell Sensor Preload
8 Rotate the foot screw counter clockwise until
the foot just contacts the flex plate (finger
tight).
9 Using an open end wrench, continue to rotate
the foot counter clockwise an additional
1/2 turn (180°). Then, while holding the foot
bolt, securely tighten the jam nut. Torque the
jam nut to 55 ft-lbs / 75 Nm.
10 Attach the load cell sensor harness.
11 Install the plastic instruction holder.
12 Calibrate the platform overload system. Refer
to,
How to Perform a Full Load Platform
Calibration.
Содержание Genie S-60 DC
Страница 151: ...July 2021 Service and Repair Manual 139 Electrical Schematic DC FE Models ...
Страница 154: ...Service and Repair Manual July 2021 142 Electrical Schematic Ground Control Box ...
Страница 155: ...July 2021 Service and Repair Manual 143 Electrical Schematic Turntable Controller ...
Страница 158: ...Service and Repair Manual July 2021 146 Electrical Schematic Platform Control Box ...
Страница 159: ...July 2021 Service and Repair Manual 147 Electrical Schematic Kubota D1105 ...
Страница 162: ...Service and Repair Manual July 2021 150 CAN BUS Wiring Diagram ...
Страница 163: ...July 2021 Service and Repair Manual 151 Power Cable Wiring Diagram ...
Страница 165: ...July 2021 Service and Repair Manual 153 Wiring Diagram AC Power Options ...
Страница 168: ...Service and Repair Manual July 2021 156 Wiring Diagram RCBO Options ...
Страница 169: ...July 2021 Service and Repair Manual 157 Hydraulic Schematic DC FE Models ...
Страница 171: ......