background image

12 

PRISM Field Upgrade Kit Instructions 

 

 

 

3.

 

Use the BNC nut driver to remove all seven of BNC nuts and lock washers. 

4.

 

Use the 3/16 inch socket nut driver to remove the two jack screws (posts) on 

the D connector. 

 

Figure 13: Remove the rear panel plate hardware

 

5.

 

Use a TORX-driver with a T-10 TORX tip to remove the four screws securing 

the rear panel plate to the  instrument. 

 

Figure 14: Remove the four rear panel plate screws

 

Содержание PRISM MPI-UP PHY-12G

Страница 1: ...PRISM MPI MPX Media Analysis Platform Field Upgrade Instructions www telestream net 075 1133 00...

Страница 2: ...ce marks trademarks or registered trademarks of their respective companies Telestream products are covered by U S and foreign patents issued and pending Information in this publication supersedes that...

Страница 3: ...Supported upgrades 1 Kit parts list 1 MPI hardware upgrades 2 Recommended tool list 2 Upgrade the PRISM MPI Eye mezzanine board 3 MPX hardware upgrades 10 Recommended tool list 10 Upgrade the PRISM MP...

Страница 4: ...lies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 This device must accept any interference received includi...

Страница 5: ...ay be operated in the countries that comprise the member countries of the European Union and the European Free Trade Association These countries listed in the following paragraph are referred to as Th...

Страница 6: ...about the environmental impact of the product Product end of life handling Observe the following guidelines when recycling an instrument or component Equipment recycling Production of this equipment...

Страница 7: ...ontent of the installed primary battery is under 1 g Each battery meets the applicable requirements of UN Manual of Tests and Criteria Part Ill Section 38 3 Battery quantity is under the limit for shi...

Страница 8: ...l only Only qualified personnel who are aware of the hazards involved should remove the cover for repair maintenance or adjustment Before use always check the product with a known source to be sure it...

Страница 9: ...n doubt about safety of the product turn it off and disconnect the power cord Clearly mark the product to prevent its further operation Before use inspect voltage probes test leads and accessories for...

Страница 10: ...e and disconnect test leads before removing protective panels soldering or replacing components Verify safety after repair Always recheck ground continuity and mains dielectric strength after performi...

Страница 11: ...dous voltages Use personal protective equipment to prevent shock and arc blast injury where hazardous live conductors are exposed When incorporating this equipment into a system the safety of that sys...

Страница 12: ......

Страница 13: ...of 12G 3G HD SD SDI Eye pattern parameters jitter parameters and jitter waveform display Option MP FMT 4K required for 12G support MPX UP PHY 12G Add SDI Physical Layer Measurement Package to the MPX...

Страница 14: ...thin the instrument are susceptible to static static discharge damage To prevent static discharge damage service the product only in a static free environment Observe standard handling precautions for...

Страница 15: ...he new Eye mezzanine board 1 Set the instrument so that the bottom is down on a static free work surface 2 Remove the top cover as follows a Use a TORX driver with a T 10 TORX tip to remove the twelve...

Страница 16: ...ve the two BNC nuts and lock washers closest to the edge of the instrument SDI IN 1 and 2 Figure 2 Remove the BNC nuts and lock washers 4 Using the TORX driver with a T 10 TORX tip to remove the screw...

Страница 17: ...tall the screw from the kit part number 211 1117 XX and the spacer post part number 129 1889 XX into the hole closest to the front of the instrument using the following method a Insert the screw from...

Страница 18: ...uide the BNC connectors through the back panel and line up the two board connectors with the connectors underneath CAUTION Bending the Eye mezzanine board can damage the board or instrument Avoid full...

Страница 19: ...p the connectors near the front panel as show in the following figure Finish inserting the connector at the back Figure 8 Line up the front connector 12 Insert the connector near the front panel Figur...

Страница 20: ...owing figure Tighten these screws to 0 6 N m 5 31 in lb Figure 10 Finish the 12G Eye mezzanine board installation 14 Replace the two BNC nuts and lock washers Tighten the BNC nuts to 1 0 N m 8 85 in l...

Страница 21: ...n the regulatory marks NOTE The MPI UP serial number label is included in the upgrade kit The label lets Factory Service know that the instrument contains the upgrade kit Figure 11 Installing the MPI...

Страница 22: ...are susceptible to static static discharge damage To prevent static discharge damage service the product only in a static free environment Observe standard handling precautions for static sensitive d...

Страница 23: ...ment and install the new Eye mezzanine board 1 Set the instrument so that the bottom is down on a static free surface 2 Remove the top cover as follows a Use a TORX driver with a T 10 TORX tip to remo...

Страница 24: ...hers 4 Use the 3 16 inch socket nut driver to remove the two jack screws posts on the D connector Figure 13 Remove the rear panel plate hardware 5 Use a TORX driver with a T 10 TORX tip to remove the...

Страница 25: ...y the rear panel plate When removing the rear panel plate be aware that the GPIO board is now loose and take steps to support it Figure 15 Remove the rear panel plate 7 Use a TORX driver with a T 10 T...

Страница 26: ...ock nuts securing the Mixed Media board module to the instrument 10 Lift up the two tabs on the side of the Mixed Media board and pull the module out of the instrument disconnecting the board from the...

Страница 27: ...bbon cable b Disconnect the USB and remove the board Figure 19 Remove the GPIO board 12 Use a TORX driver with a T 10 TORX tip to remove the four screws on the corners of the Mixed Media board 13 Slid...

Страница 28: ...er to the following figure and install the screw from the kit part number 211 1117 XX and the spacer post part number 129 1889 XX into the hole closest to second connector using the following method a...

Страница 29: ...Bending the Eye mezzanine board can damage the board or instrument Avoid fully inserting the connectors until they are properly aligned this prevents the bending of the board Figure 23 Install the 12G...

Страница 30: ...ed Media module under the fixed hardware turrets Figure 25 Slide the Mixed Media module back into chassis 22 Secure the back panel to the instrument Tighten two side screws to 0 9 N m 7 97 in lb NOTE...

Страница 31: ...nector Tighten the two jack screws to 0 6 N m 5 31 in lb Figure 26 Secure the GPIO board on the rear plate panel 25 Replace the rear panel plate as shown in the following figure Tighten the four rear...

Страница 32: ...e instrument NOTE The MPX UP serial number label is included in the upgrade kit The label lets Factory Service know that the instrument contains the upgrade kit Figure 28 Installing the MPX UP serial...

Страница 33: ...number installed on the instrument 3 Verify the latest version of firmware at the Telestream website a Use a web browser on a PC and go to the Telestream website software page www telestream net video...

Страница 34: ...rade package onto a USB memory device You need approximately 1 GB of available space on the USB device NOTE If the upgrade package included a readme txt file read the file before performing the upgrad...

Страница 35: ...Complete message box is displayed before performing these actions The upgrade may take up to five minutes NOTE The upgrade may take up to five minutes Figure 30 Upgrade Installation In Process message...

Страница 36: ...t Settings then Network and finally select the STATUS tab 3 Copy the IP address of the instrument under the CONTROL IP PORT heading 4 Open a web browser and enter in the address bar the instrument IP...

Страница 37: ...to the instrument 2 MPX only Connect the external display 3 Connect the TG8000 SDI7 module output to the SDI 1 IN input on the PRISM monitor 4 Set the SDI7 module to HD 1080 59 94i format using the fo...

Страница 38: ...e 100 Color Bars signal using the following steps a On the TG8000 push the front panel BARS test signal button b Use the left or right arrow button or push the BARS test signal button repeatedly to se...

Страница 39: ...35 Settings inputs submenu d Select one of the four physical SDI inputs to monitor The TG8000 SDI7 module output is connected to the SDI 1 input Figure 36 SDI signal configuration e Select Save and cl...

Страница 40: ...h the Tool icon and select Align from the Jitter HP Filter drop down list 10 Check for a stable eye diagram Eye Amplitude and the actual wave shape depend on the generator signal Eye Amplitude is typi...

Отзывы: