
Maintenance
Model 6750
Teledyne Analytical Instruments
52
•
Tighten three thumbnuts until
Source Assembly bottoms out on
squeeze nuts.
•
Recommend:
Use alternate tightening sequence
•
Insert lock-tight on three thumbnuts to prevent backoff.
•
Install insulation. Replace assembly as before.
•
Recalibrate NDIR (Section 4.3).
Note: IR Cell installed
incorrectly. Large outlet
port MUST go into
Detector Assembly (left)
Содержание 6750
Страница 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Страница 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Страница 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Страница 91: ...Total Organic Carbon Analyzer Appendix Teledyne Analytical Instruments 79 A 4 AS BUILT Drawings ...
Страница 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...